Design and Build Contract

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Ameet AA  on 

I am working on multiple building campus level projects which fall under same contract and same owner.

10
Senior Sustainable Design Consultant
Arup
LEEDuser Basic Member
2 thumbs up
Fri Dec 21, 2012, 11:02 am

Audits Around the World

EBOM-2009 EAc2.1:Existing Building Commissioning—Investigation and Analysis
posted by  Jenny Carney  on 

All, I'm trying to compile a list of energy audit providers outside of the US.

4
Default Avatar
Owner / Energy Engineer / Sustainability Consultant
Sustainnovations, LLC
LEEDuser Basic Member
94 thumbs up
Fri Dec 21, 2012, 12:08 am
5
Thu Dec 20, 2012, 11:14 pm

Air cooled chillers and other air cooled equipment.

NC-2009 EAp2:Minimum Energy Performance
posted by  Rudolph Carneiro  on 

Question: If I have an air cooled chiller selected at non-ARI conditions that has a full load efficiency of 3.0 COP, does it comply with the minimum efficiency requirement of 2.8 COP from ASHRAE -

3
Thu Dec 20, 2012, 9:01 pm
6
Default Avatar
Senior ESD Consultant
LEEDuser Basic Member
62 thumbs up
Thu Dec 20, 2012, 8:53 pm

Innovation points no longer recognized?

NC-2009 IDc1:Innovation in Design
posted by  Kris Phillips  on 

I have conflicting information on a few Innovation points that have been achieved on certain projects, but are apparently being denied on current projects being deemed "too easy" by the GBCI review

5
Default Avatar
Sustainable Building Services Project Manager
Architectural Energy Corporation
LEEDuser Basic Member
6 thumbs up
Thu Dec 20, 2012, 4:58 pm

Cooling and heating specification

NC-2009 EAc1:Optimize Energy Performance
posted by  Jatuwat Varodompun  on 

If my project does not have any heating system at all (but it will have cooling system), Are the baseline and proposed models required to have defualt heating system as specified in appendix G?

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Thu Dec 20, 2012, 3:03 pm

Evaporative Coolers and ASHRAE Mandatory Requirements 6.4.3.4

NC-2009 EAc1:Optimize Energy Performance
posted by  Jorge Torres-Coto  on 

If I have a space (manufacturing warehouse) that is served by Evaporative Coolers only. Do the Mandatory Requirements of ASHRAE 90.1 section 6.4.3.4.2 & 6.4.3.4.3 apply?

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Wed Dec 19, 2012, 11:08 pm

Submetering - Process Water

CI-2009 EAc3:Measurement and Verification
posted by  Michelle Rosenberger  on 

I can see in the threads some discussion about submeters and what really constitutes complying with Case 1 but I'm still confused.

4
Default Avatar
Designer, Sustainability Department
LEEDuser Basic Member
2 thumbs up
Wed Dec 19, 2012, 4:54 pm

Title 24 vs. ASHRAE as baseline

CI-2009 EAc1.1:Optimize Energy Performance—Lighting Power
posted by  Michelle Rosenberger  on 

I'm not sure where to post this EApr2 form but Lighting Power Density question. I see there has been some discussion about the issue of Title 24 vs.

4
Sr. Electrical Engineer
Integrated Design Solutions
LEEDuser Expert
516 thumbs up
Wed Dec 19, 2012, 4:49 pm