Log in
Forum
Topic

Provide a safe working environment during construction?

Pilot-Credits INpc136: Safety First: Re-Enter Your Workspace
posted by Bethany Beers on Mar 2, 2021, 1:26 pm

We interpreted the intent of these two pilot credits (Safety First - Cleaning and Disinfecting; Re-enter Your Workplace) to be: provide a safe working environment during construction. For this...

Water Performance Metering in a complex

EBOM-v4.1 WEc1: Water Performance
posted by Monica Chavez on Mar 2, 2021, 5:45 pm

Hello,

I am working in a project located in a complex that is pursuing the LEED...

Decentralized PM measuring devices permanent installation

NC-v4.1 EQc4: Indoor air quality assessment
posted by Sascha Krause on Mar 3, 2021, 9:48 am

Hello all,

It's first time that I work with LEED regulations and can't find something about permament installation of PM measuring devices and whether installed devices can improve the...

Particulate Measurements for V4.1

NC-v4.1 EQc4: Indoor air quality assessment
posted by Sharon Bessa on Mar 3, 2021, 5:51 pm

I have been advised that the TSI Dust-Trak DRX can now be used for the particulate measurements.

Has anyone used this successfully (gained certification)?

Is it acceptable to use...

Irrigated areas and vegetated non-irrigated areas- How to include in calculator?

NC-v4 WEp1: Outdoor water use reduction
posted by Erica Downs on Mar 5, 2021, 11:38 pm

The reference guide's step-by-step language says:

If only part of the lot is irrigated, complete the calculation twice—once for the irrigated section, and again for the...

Air Testing- Direct Reading

NC-v4 EQc4: Indoor air quality assessment
posted by HONG MEE SONG on Mar 9, 2021, 1:01 pm

Are direct reading method acceptable for the reading of parameters for Particulates, CO2, CO and Ozone? The reference...

Sanitization inclusion

Pilot-Credits WEpc115: Whole Project Water Use Reduction
posted by Thiago Sheidy on Mar 10, 2021, 3:32 am

We are aiming to include water for sanitization of wet areas, such as kitchens, restaurants and toilets. Calculations/ assumptions:

- 01 bucket (15L) containing Water,

- 01 bucket (...

MRc5.Opt 2- Straight Forward or Not?

Schools-NC-v4.1 MRc5: Construction and demolition waste management
posted by Kyle Roth on Mar 12, 2021, 12:14 pm

Option 2 seems straight forward, but as I read it over again there seems to be holes.  Option 2 states to include all construction and demolition waste and diverted materials in the calculation...

Exterior Noise Reduction

Pilot-Credits EQpc57: Enhanced acoustical performance - exterior noise control
posted by ANTONIO CERECEDA on Mar 15, 2021, 5:26 am

Exterior noise reduction of buildings is an environmental strategy very interesting because normally in huge cities noise levels are very high and a great problem.

Indoor Air Quality Compliance- LEED 2009 / LEED v4.1

NC-2009 IEQc4.3: Low-emitting materials - flooring systems
posted by MARK BAUER on Mar 17, 2021, 7:06 am

Hi,

We have been asked to demonstrate that our product (a vinyl floor covering) is in compliance with requirement.One path to compliance is to meet testing requirements of CDPH Standard...