Forum quick links
Calculating diversion by "replacement value" or weight
EBOM-2009 MRc8:Solid Waste Management—Durable Goodsposted by Lyle Axelarris on
The Reference Guide says "Reuse or recycle 75% of the durable goods waste stream (by weight, volume or REPLACEMENT VALUE) during the performance period." However, all of the discussion that I have
cold room and energy sim
NC-2009 EAp2:Minimum Energy Performanceposted by Jatuwat Varodompun on
We are working a factory which has a small freezer room of 200 sf. How should we model this part?
Construction Activity Pollution Prevention
posted by Ameet AA on
Where can i find which credits are applicable for Mastersite?
Net metering
NC-2009 EAc2:On-Site Renewable Energyposted by Michael Beattie on
Our project will support a PV array capable of supplying 15% of the building's electrical needs.
including furniture in all MR credits
NC-2009 MRc2:Construction Waste Managementposted by Vera Voropaeva on
After the first review we received a comment that furniture calculations should be included in all MR credits 3-7. Furniture is applicable for reused material and thus counted toward MRc3.
Biodiesel?
CS-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by American University on
The glossary definition of "alternative-fuel vehicles use low-polluting, non-gasoline fuels such as electricity, hydrogen, propane, compressed natural gas, liquid natural gas, methanol, and ethanol
Green Walls
CS-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Marcio Alberto Casado Pereira on
Hi all! Can I get any benefit from having green walls in my project, for the purpose of this credit? P.S: It is a Previously Developed Area.
Which type of water needs to be filtered?
NC-2009 SSc6.2:Stormwater Design—Quality Controlposted by Marcio Alberto Casado Pereira on
Dear all, Please confirm this assumption - our interpretation of this credit is that it only applies to runoff, not to roof captured water. Is this correct?
Health Care - New Construction
NC-2009 IEQc6.1:Controllability of Systems—Lightingposted by William Kelly on
For IEQ credit 6.1 Controllability of Systems - Lighting: The requirements for patient areas states "to provide individual lighting controls for 90% (minimum) of patients to enable adjustments to s
Submitting Credits at Very End?
posted by Dave Wortman on
We have a project for which we did a design phase submittal- we are now nearly completion on our construction phase submittal.