Should I consider process water?
NC-2009 WEc2:Innovative Wastewater Technologiesposted by Nadia Ayala on
Hi, My project is a pharmaceutical facility. For their industrial process, they use a fairly large amount of water. I was wondering if process water is considered for this credit.
Include curbs and tops of walls? SRI of granite curb?
NC-2009 SSc7.1:Heat Island Effect—Non-Roofposted by Erica Downs on
In adding up the "paved" areas, are granite curbs (between the sidewalk and street) typically included?
Thermostat Values
CS-2009 EAp2:Minimum Energy Performanceposted by Herman C on
Hello, How are the Thermostat values (Upper and Lower limit) to be selected for LEED CS please?
Hotel and Convention Center - Registration as One project
NC-2009 MPR2:Must be a complete, permanent building or spaceposted by Ahmad Gabir on
We have a hotel building (600,000 sf) and a convention center (150,000 sf) which are connected by a 300-400 feet ong corridor.
NC Comercial Building into a LEED ND Neighborhood (Stage 1)
NC-2009 SSc2:Development Density and Community Connectivityposted by Gaston Viau on
Our project is located into a LEED Neighborhood Development which obtained Stage 1 certification.
LEED Canada SS Credit 6.1 - Stormwater - Cistern Sizing
posted by Meghan MacSween on
Hi, The 2009 version of LEED included an interpretation for the SS6.1 credit stating that controling site discharge using storage such as cisterns could meet the credit requirements even if the en
Hazardous Chemical Clarification
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Edward Gulick on
The small project I'm working on will have a small janitors closet with a mop basin, as well as a stacked washer/dryer for rags and towels.
Differential Pressure Measurement
EBOM-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Oliver Glahn on
Hello, has anyone experience in conducting the differential air pressure measurement of a smoking room with respect to each adjacent vertial chase? This requirement seems very difficult to meet.
buidable land
ND-v2009 SLLc6:Steep slope protectionposted by Noriko Nagazumi on
Hi, Is the definition of buildable land under LEED-ND identical to the following statement quoted from http://www.ci.blaine.mn.us/index2col.cfm?id=901246? "The space remaining on a lot after the mi