Forum quick links
Already Registered as Master Site (Campus) and NOW Want Group?
posted by Michelle Bracewell-Musson on
Hello All, 1.) What is the process for how to switch to Group if we are already registered as MS?
Exterior lighting on building roof surface
NC-2009 EAp2:Minimum Energy Performanceposted by Wei Jiang on
I'm working on a project with sitting areas and outdoor swimming pool on a building flat roof surface and installed with exterior lighting.
Credit Achievement Rates
Schools-2009 MRc5:Regional Materialsposted by Tim Crowley on
I see that LEEDUser is not posting Credit Achievement Rates.
Building Addition - reseeding turf grass - credit applicable
Schools-2009 WEc1:Water Efficient Landscapingposted by Michael Kros on
Our project in south-central South Dakota consists of a building addition over a previously graded turf area.
I still don't understand how
NC-2009 EAc4:Enhanced Refrigerant Managementposted by Nelina Loiselle on
I still don't understand how I am supposed to find out or calcuate int Rc? Is this a number you get from the manufacturer?
Is Retail or CI possible for an existing building?
posted by Ville-Veikko Santala on
The owner of a recently finished retail project wants to certify the building under LEED D+C. The construction finished a couple of days ago and the tenants will be moving in soon.
Non-U.S. Regional Priority Credits for LEED ND
posted by Jaume Albertí on
Hi there, What about regional priority credits outside the US concerning to LEED Neighbourhood Development certification system?
LEED-CI Commissioned system
CI-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Adam Targowski on
LEED-CI Commissioned system I have a question concerning commissioned systems. The office which I would like to certify with LEED CI will have only interior lighting changed.
LEED for Retail - MRp1 Waste Stream Study
posted by Sarah Gaughan on
I am doing projects for both LEED for Retail NC & CI. MRp1 requires a waste stream study. Has anyone done this study yet? Are there specific requirements?