Future Municipal Greywater System Near SIte WEc1

NC-2009 WEc1: Water Efficient Landscaping
posted by MANNY IGLESIA on Mar 26, 2019, 2:43 pm

There is a fully funded Recycled Water Distribution System that is due to start by mid this year until the third quarter of 2021. The location of this proposed treatment plant is just behind our...

Last reply: MANNY IGLESIA, Jul 16, 2019, 3:45 pm

Passive Survivability and Back-up Power During Disruptions

NC-v4 INc1: Innovation
posted by Ridhwan Omar on Mar 29, 2019, 10:42 am

Hello LEEDUsers!

We have a resort hotel project in one of the islands in Micronesia.

Due to reliability problems with the electricity system on the island and the lack of reserve...

Last reply: Graham Linn, Aug 14, 2023, 1:28 pm

Lighting Power Modeling for Core and Shell Building

CS-v4 EAp2: Minimum Energy Performance
posted by Saif Alsaeed on Apr 10, 2019, 10:50 am

Hi,

I am trying to model the lighting power for a core and shell office building, the lighting is designed for the core spaces such as main lobby, restrooms and BOH, but the tenant spaces...

Last reply: Saif Alsaeed, Apr 10, 2019, 1:14 pm

Space Control ASHRAE 90.1 2010 9.4.1.2

CI-v4 EAp2: Minimum Energy Performance
posted by Ciaran McCabe on May 22, 2019, 8:14 am

ASHRAE 90.1 2010 9.4.1.2 Space Control states: 

"Each space enclosed by ceiling height partitions shall have at least one control device to independently control the general lighting...

Last reply: Edna Urias, Jul 30, 2019, 4:09 pm

EVSE and ADA parking spaces

NC-v4.1 LTc8: Electric Vehicles
posted by Bryna Dunn on May 24, 2019, 10:17 am

Has anyone submitted a project that includes ADA spaces in the spaces served by EVSE?  For example, if a total of 3 charging stations are required on a project, and one of those is placed at an...

Last reply: Bryna Dunn, Nov 10, 2022, 1:52 pm

Core Shell Daylighting

CS-v4 EAp2: Minimum Energy Performance
posted by Lorey Flick on Jun 12, 2019, 10:40 am

Lorey Flick Partner Flick Engineering Professionals LEEDuser Premium Member 38 thumbs up June 12, 2019- 10:46 am Please disregard the last 3 paragraphs- I copied from a previous forum as I wrote my question...Another question- How do you edit after you post??  Log in or register to post comments Marcus Sheffer LEED Fellow 7group / Energy Opportunities LEEDuser Expert 5903 thumbs up June 12, 2019- 2:43 pm In v4 daylighting for the perimeter spaces is required by 90.1-2010. No daylight can't be excluded from spaces where it is required. If you wish to claim savings for daylighting in tenant spaces you will need...

Last reply: Marcus Sheffer, Jun 18, 2019, 5:42 pm

CHP Modeling patch confusion

NC-v4 EAp2: Minimum Energy Performance
posted by Przemysław Rejczak on Jun 26, 2019, 11:48 am

Dear Everyone,

Many of our buildings are connected to...

Last reply: Tyler Thumma, Sep 12, 2019, 7:50 pm

Number/Location of water meter

NC-v4 WEc4: Water metering
posted by Summer on Jul 21, 2019, 5:14 am

I'm confused if we need to provide the water meter every indoor water fixtures or per floor. Does anyone has experience on this? Thanks.

Last reply: Olga Yuil, Feb 22, 2023, 6:45 pm

LEED O+M for Commercial Interiors

LEED Rating System Selection
posted by Geraldine Seguela RAIA on Aug 7, 2019, 11:22 pm

to come into play, does anyone have any guidance on using whole building energy/water and only tenant space IAQ, etc.? Happy to shift to another question/forum as well. Thanks! Log in or register to post...

Last reply: Jose Antonio Kovacevic, Oct 21, 2022, 12:02 pm

Base buildings required in calculator & WaterSense labelled?

CI-v4 WEp1: Indoor water use reduction
posted by RDK E&S on Sep 3, 2019, 2:57 pm

Hi everyone, 

I received a comment on a project for not including base building fixtures in the water reduction calculator. Based on the LEED user excerpt below, I was led to believe they...

Last reply: Eric Bautista, Feb 15, 2020, 6:23 pm