Kitchen Make-up air unitNC-2009 EAp2: Minimum Energy Performanceposted by Anil Bhari on May 15, 2014, 9:58 am
Is Make-up air unit considered as process load? Last reply: Marcus Sheffer, May 23, 2014, 12:55 pm |
|
CARB and ECO-CertifiedGeneral forumsposted by Erika Duran on May 22, 2014, 1:35 pm
I have a sub that just submitted documentation for Particle board that is "Third party certified (California ARB approve TPC-1) to comply with CCR 93120.2 (... Last reply: Brent Ehrlich, Jun 8, 2017, 4:15 pm |
|
VOCs France A+ Class vs France A+ Class & AgBBNC-v4 EQc2: Low-emitting materialsposted by Ian McCall on Jul 7, 2014, 9:46 am
Hello, Under General Emissions Evaluation for projects in France (ex. Flooring ): 1) Is a product testing ISO 16000 with French legislation... Last reply: Reinhard Oppl, Feb 5, 2019, 5:05 am |
|
Baseline system > 70% OA based on 20 degree riseNC-2009 EAp2: Minimum Energy Performanceposted by Matt Scott on Aug 13, 2014, 5:02 pm
I have a packaged multi-zone... Last reply: Matt Scott, Aug 14, 2014, 2:59 pm |
|
BES 6001- USGBC approved leadership extraction practice?NC-v4 MRc3: Building product disclosure and optimization - sourcing of raw materialsposted by Juliana Moreira on Jan 7, 2015, 11:42 am
The credit intent is to reward project teams for selecting products verified to have been extracted or sourced in a responsible manner. In the UK we have standard BES 6001 to enable... Last reply: Dave Hubka, Nov 27, 2023, 10:26 am |
|
Naturally ventilated corridorsNC-2009 IEQp1: Minimum indoor air quality performanceposted by Stella Stella on Mar 23, 2015, 3:17 am
In one of our project we have a Main corridor that is completely open with just a parapet wall and roof overhang. Now we have another small corridor that is connected to this Main corridor. The... Last reply: Dave Hubka, Apr 1, 2015, 7:27 am |
|
Operable windowsNC-2009 IEQc6.2: Controllability of systems - thermal comfortposted by Charalampos Giannikopoulos on Jan 31, 2015, 9:01 am
For an office space with 100 individual working spaces the project team has used operable windows in order to provide thermal comfort control. 80 working spaces are located within 20 feet of a... Last reply: Larissa Oaks, Jun 27, 2016, 3:32 pm |
|
Rounding of Percent Energy Cost Savings for EAc1 PointsNC-2009 EAc1: Optimize Energy Performanceposted by Joseph Chappell on Aug 13, 2015, 2:53 pm
Hi all, We recently received a final design review where our percent energy cost savings have been corrected by the reviewer to show 31.95%. This project is an existing building... Last reply: Christopher Schaffner, Sep 14, 2015, 10:04 am |
|
Ratioing DES On-Site Renewable Energy CostsNC-2009 EAp2: Minimum Energy Performanceposted by Lawrence Lile on Dec 17, 2015, 2:20 pmv4 forum since it is a v4 question? Log in or register to post comments ... Last reply: Marcus Sheffer, Oct 25, 2023, 10:19 am |
|
Standby LossesCI-2009 EAp2: Minimum Energy Performanceposted by Ciaran McCabe on Jan 6, 2016, 7:44 am
How does one calculate the required Standby loss for a domestic hot water calorifier. I have the rated values in kwh/day from the manufacturer but not sure how or where I can get the required... Last reply: Marcus Sheffer, Jul 20, 2018, 1:00 pm |