Baseline System 8CI-v4 EAp2: Minimum Energy Performanceposted by Gustav Alfaro on Apr 14, 2018, 7:06 pm
Hi to all, Our project scope is modeling one floor of a 20 stories office building. It is clear that we must use system 8 for the baseline based on the full office building... Last reply: Tyler Thumma, Jun 10, 2020, 3:08 pm |
|
Innovation- Green Building EducationCS-v4 INc1: Innovationposted by Luis Fretes on Apr 24, 2018, 2:28 pm
I have a couple of questions regarding the Green Building Education credit: 1) Can the Green Cleaning Policy be uploaded as it's own seperate Innovation Credit? 2) One of the... Last reply: Adrienne Franz, Apr 18, 2024, 4:04 pm |
|
Form Relase CompoundNC-v4 EQc2: Low-emitting materialsposted by Irene Chung on Apr 30, 2018, 4:48 pm
Hi, Can anyone please confirm if form release compounds need to meet both... Last reply: Jolene McLaughlin, Dec 6, 2018, 9:35 am |
|
Method to report proposed case Energy consumption- On site Gas Engine based electricity generationNC-2009 EAp2: Minimum Energy Performanceposted by Rahula Attalage on May 5, 2018, 8:01 pm
Dear All, I have received the following comment by the reviewer: "The method used to report the Proposed case energy consumptions does not account for the gas consumption and... Last reply: Marcus Sheffer, May 17, 2018, 10:34 am |
|
LEED CI V4 Tenant space modeling interpretationCI-v4 EAp2: Minimum Energy Performanceposted by Vipul Babriya on May 9, 2018, 2:38 pm
Hello, We have a fit out project for medical offices ~16,000 SF that is going for LEED CI V4 certification. The... Last reply: Marcus Sheffer, May 11, 2018, 11:26 am |
|
Modeling Electric Unit HeaterNC-2009 EAp2: Minimum Energy Performanceposted by Nishank Shah on May 10, 2018, 9:07 pm
I have to model electric unit heaters in HAP for spaces like Stairs, Trash rooms, Vestibules etc. The issue is that the Stairs are already served by heat pumps and electric unit heaters will turn... Last reply: Nishank Shah, May 11, 2018, 11:49 am |
|
Achievement Rates for Exemplary PerformanceNC-2009 MRc2: Construction Waste Managementposted by Francis Hernández on May 14, 2018, 11:25 amMember 46 thumbs up May 16, 2018- 1:53 pm Francis, See this link for a project that achieved 100% C&D waste recycling: https://leeduser.buildinggreen.com/forum/mrc2-100-diversions Debra Log... Last reply: RETIRED, Jun 19, 2018, 2:42 pm |
|
Using ASHRAE 90.1-2013 as reference standard for v4 projectsNC-v4 EAp2: Minimum Energy Performanceposted by Gail Vittori on May 21, 2018, 2:52 pm
Has there been an equivalency established for LEED v4 projects that use ASHRAE 90.1-2013-Appendix G as reference standard (as there was for LEED 2009 projects that used ASHRAE 90.1-2010-Appendix... Last reply: Jamy Bacchus, Jan 7, 2020, 1:32 pm |
|
Install electric chargers by phasesNC-2009 SSc4.3: Alternative transportation - low-emitting and fuel-efficient vehiclesposted by Instra Ingenieros on May 22, 2018, 7:20 amrequirements (some rating systems have other requirements). Visit the v4 forum for discussion of the requirements. Log in or register to post comments Instra Ingenieros Chemical engineer Instra Ingenieros, S.L.... Last reply: Instra Ingenieros, May 24, 2018, 11:35 am |
|
Bicycle racks distanceCS-v4 LTc6: Bicycle facilitiesposted by Guillaume Rose on May 28, 2018, 5:41 am
Hi, In my Project, there are 2 bicycle areas : - 1 at the same level as the entrance but the distance is more than 30 meters - 1 in the basement, but a lift dedicated to... Last reply: Emily Purcell, Mar 27, 2019, 9:57 am |