Forum quick links
LEED GA and LEED AP exam changes
posted by Michael Zhang on
Hi Tristan Roberts- With the development and release of LEED 2012 in Nov.
Multiple bus stops
ND-v2009 SLLc3:Locations with reduced automobile dependenceposted by Martine Desbois on
Eliot is it correct that a bus that has multiple stops within 1/4 mile can on be counted once? Or rather once inbound and once outbound?
Do cubicle partitions count as furniture/durable goods in MRC2?
EBOM-2009 MRc2:Sustainable Purchasing—Durable Goodsposted by Jubilee Daniels, MLA, LEED AP O+M on
Calling all experts- in your experience do new cubicle walls/partitions count as "furniture" in LEED EBOM 2009. How about white/cork boards and things of that nature?
Previously developed site definition
NC-2009 SSc2:Development Density and Community Connectivityposted by Jean-Baptiste Noel on
The project we are working on is to be built on a land that has been graded as it is part of a national master plan that defines the plot ratio and creates the buildable plots in advance.
Sum of LPBs = 100% of LCB?
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Zonda E. Team on
Dear all, I find these below in contradiction. If so, does anybody know which is correct? Supplemental Guidance to MPR revision 2 (1 Sep 2011) - MPR 3: "3.
Previously developed land
ND-v2009 PIf1:Development Program and Site Typeposted by Tyler Baker on
We have a large piece of land which was formerly single family detached housing.
Pre-rinse valve
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Mike D on
The project has a pre-rinse valve with a flow rate of 1.27gallons per minute. How do I estimate daily uses and duration? Thanks!
Non-contiguous land to associate with LEED boundary
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Julie Blue on
To support this project we installed a geo-thermal system under an existing playing field that is across the street from the new building addition we are certifying.
IEQ c4.3 Option 1 - Combination of standards
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Hanne Goa on
Hello, Does "Option 1.
LEED Project Providing Replacement Parking
NC-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by Kellie Hollenbeck on
We have a LEED project that is taking a parcel used for an adjacent county building’s employee parking.