I am trying to document this credit and we have not occupied the building for more than 3 months. So we are not able to document via the "Actual Consumption" route. However, to use the "Design Electricity Consumption" route, "The project space regulated electricity use for green power calculations are based on the design energy cost from the Lighting Power Density section of EA Prerequisite 2 and the Design Case Energy Use from EA Credit1.3 Option 2. (Note: this option shall only be selected if EA Prerequisite 2 and EA Credit 1.3 are complete)." However, we did not complete EAc1.3. We have our Title 24/Energy Model since we are in CA. But this LEED Template explicitly says I have to have completed EAc1.3, which I have not. How do I document this credit since my project is purchasing 100% RECs for two years?