Log in
Forum
Topic

Core Performance Guide

CI-2009 EAc1.3: Optimize energy performance - HVAC
posted by Ciaran McCabe on Nov 27, 2015, 9:54 am

Hi, Can somebody please send me the link to where I can get the "New Building Institute Advanced Buildings Core Performance Guide applicable for LEED CI 2009. Thanks.

Last reply: Marcus Sheffer, Dec 2, 2015, 9:27 am

Operable Windows & Mechanical Ventilation

NC-2009 IEQc6.2: Controllability of systems - thermal comfort
posted by Charalampos Giannikopoulos on Nov 29, 2015, 4:00 pm

Would an operable window be an eligible type of thermal comfort control in a mechanically ventilated building or would such a control require that the building is naturally ventilated?

Last reply: Dandan Li, Sep 1, 2016, 9:58 am

3 LEED projects sitting on a parking & retail layer cake

NC-2009 MRc4: Recycled Content
posted by Susan Di Giulio on Dec 1, 2015, 6:15 pm

Hi,

We have a campus master site occupying a city block. There are 7 podium floors with a hotel, condo towers and retail sprouting from them that are parsed into 3 separate LEED projects...

Last reply: Robin Dukelow, Apr 21, 2016, 1:50 pm

Problem with FSC and COC shipped from other country.

NC-2009 MRc7: Certified Wood
posted by Somsak Jidmon on Dec 8, 2015, 11:11 pm

We have the LEED NC 2009 project that under construction and we attempt to get the credit of MRc7 -...

Last reply: Somsak Jidmon, Dec 15, 2015, 10:29 pm

Baseline Construction Performance

CS-2009 EAc1: Optimize Energy Performance
posted by Ciaran McCabe on Dec 14, 2015, 7:38 am

When modelling the Baseline where the building is existing (not a new build) what is the procedure for selecting the baseline constructions in the model. This building is outside the US. Do we...

Last reply: Marcus Sheffer, Dec 16, 2015, 9:39 am

rooftop parking lots

NC-2009 SSc7.2: Heat island effect - roof
posted by Noriko Nagazumi on Jan 8, 2016, 1:26 am

Hi,

Our project building is retail facility and has 4 above grade floors. The entire facility is conditioned. There is a parking floor above the retail floors. The parking lot floor is...

Last reply: Noriko Nagazumi, Jan 13, 2016, 10:24 pm

Baseline systems

CS-2009 EAp2: Minimum Energy Performance
posted by Samuel Sura on Jan 8, 2016, 6:50 am

Hi LeedUsers,

I have one simple question. According to section G3.1.1 of ASHRAE 90.1 Standard each floor for system 5 through 8 shall be modeled with a separate HVAC system. I hope it...

Last reply: Samuel Sura, Jan 13, 2016, 8:34 am

Green Cleaning as NC ID credit

EBOM-2009 IEQp3: Green Cleaning Policy
posted by Jordan Kirrane on Jan 11, 2016, 10:13 am

Hi, I am pursuing Green Cleaning as an ID credit for a NC v3 building. Does anyone know when does the performance period begin? Or because this is NC there is no need to consider a performance...

Last reply: Trista Brown, Jul 25, 2017, 11:25 am

PRM Modelling Queries

CS-2009 EAc1: Optimize Energy Performance
posted by Ciaran McCabe on Jan 13, 2016, 5:19 am

Hi,

I have 2 questions in relation to the 90.1 Energy Model.

1) Is Dublin (Ireland) in ASHRAE climate zone 5 or 5a.

2) The building to be modeled is a 5 storey building with...

Last reply: Ciaran McCabe, Jan 22, 2016, 11:38 am

EAP2 Minimum Energy Performance-- How to classify building

EBOM-2009 EAp2: Minimum Energy Efficiency Performance
posted by cathy keagle on Jan 20, 2016, 2:16 pm

We have a client that would like to attempt to certify one building that is part of a college campus. This building is primarily instructional classrooms, some office space, and an auditorium....

Last reply: cathy keagle, Feb 16, 2017, 12:52 pm