Topic | Recent |
---|---|
Core Performance GuideCI-2009 EAc1.3: Optimize energy performance - HVACposted by Ciaran McCabe on Nov 27, 2015, 9:54 am
Hi, Can somebody please send me the link to where I can get the "New Building Institute Advanced Buildings Core Performance Guide applicable for LEED CI 2009. Thanks. Last reply: Marcus Sheffer, Dec 2, 2015, 9:27 am |
|
Operable Windows & Mechanical VentilationNC-2009 IEQc6.2: Controllability of systems - thermal comfortposted by Charalampos Giannikopoulos on Nov 29, 2015, 4:00 pm
Would an operable window be an eligible type of thermal comfort control in a mechanically ventilated building or would such a control require that the building is naturally ventilated? Last reply: Dandan Li, Sep 1, 2016, 9:58 am |
|
3 LEED projects sitting on a parking & retail layer cakeNC-2009 MRc4: Recycled Contentposted by Susan Di Giulio on Dec 1, 2015, 6:15 pm
Hi, We have a campus master site occupying a city block. There are 7 podium floors with a hotel, condo towers and retail sprouting from them that are parsed into 3 separate LEED projects... Last reply: Robin Dukelow, Apr 21, 2016, 1:50 pm |
|
Problem with FSC and COC shipped from other country.NC-2009 MRc7: Certified Woodposted by Somsak Jidmon on Dec 8, 2015, 11:11 pm
We have the LEED NC 2009 project that under construction and we attempt to get the credit of MRc7 -... Last reply: Somsak Jidmon, Dec 15, 2015, 10:29 pm |
|
Baseline Construction PerformanceCS-2009 EAc1: Optimize Energy Performanceposted by Ciaran McCabe on Dec 14, 2015, 7:38 am
When modelling the Baseline where the building is existing (not a new build) what is the procedure for selecting the baseline constructions in the model. This building is outside the US. Do we... Last reply: Marcus Sheffer, Dec 16, 2015, 9:39 am |
|
rooftop parking lotsNC-2009 SSc7.2: Heat island effect - roofposted by Noriko Nagazumi on Jan 8, 2016, 1:26 am
Hi, Our project building is retail facility and has 4 above grade floors. The entire facility is conditioned. There is a parking floor above the retail floors. The parking lot floor is... Last reply: Noriko Nagazumi, Jan 13, 2016, 10:24 pm |
|
Baseline systemsCS-2009 EAp2: Minimum Energy Performanceposted by Samuel Sura on Jan 8, 2016, 6:50 am
Hi LeedUsers, I have one simple question. According to section G3.1.1 of ASHRAE 90.1 Standard each floor for system 5 through 8 shall be modeled with a separate HVAC system. I hope it... Last reply: Samuel Sura, Jan 13, 2016, 8:34 am |
|
Green Cleaning as NC ID creditEBOM-2009 IEQp3: Green Cleaning Policyposted by Jordan Kirrane on Jan 11, 2016, 10:13 am
Hi, I am pursuing Green Cleaning as an ID credit for a NC v3 building. Does anyone know when does the performance period begin? Or because this is NC there is no need to consider a performance... Last reply: Trista Brown, Jul 25, 2017, 11:25 am |
|
PRM Modelling QueriesCS-2009 EAc1: Optimize Energy Performanceposted by Ciaran McCabe on Jan 13, 2016, 5:19 am
Hi, I have 2 questions in relation to the 90.1 Energy Model. 1) Is Dublin (Ireland) in ASHRAE climate zone 5 or 5a. 2) The building to be modeled is a 5 storey building with... Last reply: Ciaran McCabe, Jan 22, 2016, 11:38 am |
|
EAP2 Minimum Energy Performance-- How to classify buildingEBOM-2009 EAp2: Minimum Energy Efficiency Performanceposted by cathy keagle on Jan 20, 2016, 2:16 pm
We have a client that would like to attempt to certify one building that is part of a college campus. This building is primarily instructional classrooms, some office space, and an auditorium.... Last reply: cathy keagle, Feb 16, 2017, 12:52 pm |