District humidificationNC-2009 EAp2: Minimum Energy Performanceposted by Haojie Wang on Jun 4, 2015, 8:48 am
We have a project that uses on site boiler for space heating and district steam for humidification. I wonder if we should still follow... Last reply: Haojie Wang, Jun 4, 2015, 1:11 pm |
|
How are individual guestroom VTACs calculated?NC-v4 EAc3: Advanced Energy Meteringposted by Karen Heet on Jun 5, 2015, 11:23 am
Howdy! We're working on a hospitality project and are wondering if all of the guest room VTACs are combined or counted individually for this credit? Any advice is much appreciated. ...Last reply: Joshua Radoff, Jul 30, 2015, 5:39 pm |
|
Utility Bills for REC Green Power Calculations...NC-2009 EAc6: Green Powerposted by Rick Alfandre on Jun 5, 2015, 4:17 pm
The link below, fromLEEDuser, indicates that if you can use actual utility bills x 50% x 2 yrs to calculate the required quantity of RECs as opposed to the EAc1 energy model design consumption x... Last reply: Curtis Dorosh, Jan 18, 2018, 10:48 am |
|
Residential Equip in a Commercial ContextCI-2009 EAc1.4: Optimize energy performance - equipment and appliancesposted by Michelle Rosenberger on Jun 8, 2015, 1:25 pm
My CI project has a full blown café. In addition to a huge list of commercial kitchen equipment, they have also included numerous Miele products including refrigerators, dishwashers and... Last reply: Michelle Rosenberger, Mar 10, 2016, 4:07 pm |
|
Paints on the tack welds- HVAC ductsCS-2009 IEQc4.2: Low-emitting materials - paints and coatingsposted by Cansin Manyas on Jun 8, 2015, 4:23 pm
Our S/C wants to use a zinc rich paint on the tack welds of the ducts and he argues that the amount is too low and negligible. I asked for the... Last reply: Cansin Manyas, Jun 16, 2015, 3:22 am |
|
Is the credit for during construction, or after envelope is up?NC-2009 IEQc3.1: Construction IAQ management plan - during constructionposted by Nelina Loiselle on Jul 1, 2015, 3:54 pm
We have an issue with a General Contractor on a project. There were poor conditions on the job site captured by images found at:... Last reply: Nelina Loiselle, Jul 3, 2015, 2:18 pm |
|
fuel sourceCS-2009 EAc5.1: Measurement and verification - base buildingposted by Matthew VanSweden on Jul 6, 2015, 4:23 pm
Our project is a three story Professional Office Building addition to an adjacent hospital. The central plant [also adjacent to our project] will be providing hot water, steam, and chilled water... Last reply: Matthew VanSweden, Jul 28, 2015, 1:15 pm |
|
AssembliesNC-2009 MRc4: Recycled Contentposted by David Brown on Jul 16, 2015, 11:36 am
In idiot terms could someone please tell me what makes up an "... Last reply: Jon Clifford, Aug 17, 2016, 10:16 pm |
|
Residential high rise with school at the baseNC-2009 MPR2: Must be a complete, permanent building or spaceposted by Ilana Judah on Jul 22, 2015, 12:55 pm
We are designing a high-rise residential tower with a school and retail area at the base. There is some entry and service space serving the residential tower on the cellar and ground floor levels... Last reply: Ilana Judah, Aug 5, 2015, 10:32 am |
|
Green WallNC-2009 WEc1: Water Efficient Landscapingposted by Paula Hernandez on Jul 27, 2015, 4:49 pm
Hi, our project is considering a green wall with drip irrigation. How do you declare that? I'm thinking of adding a spread sheet describing the types of spaces (green roof, planters, vegetation... Last reply: Andrey Kuznetsov, Jan 29, 2016, 4:43 am |