Log in
Forum
Topic

LEED Interpretation: get recycled content figures by plant

NC-2009 MRc4: Recycled Content
posted by Tristan Roberts on Oct 31, 2012, 10:06 am

LEED Interpretation #10246, out on 10/1/12, makes a pretty big change to documentation requirements for MRc4 (effective for...

Last reply: Tristan Roberts, Jan 30, 2013, 12:02 pm

ISO 140001 Certification

NC-2009 IDc1: Innovation in Design
posted by kathy zarsky on Nov 27, 2012, 6:45 pm

Has anyone had any success in receiving an innovation credit point for this with LEED version 2009?

Last reply: Anna Foden, Dec 18, 2020, 12:28 pm

CxA contracting for enhanced commissioning in a design&build pro

NC-2009 EAc3: Enhanced Commissioning
posted by Valentin Grimaud on Nov 29, 2012, 7:38 pm

Dear All,

We have a 300,000sqft project, quite technical facility.

It is a design&build contract and the owner is reluctant on taking independent contracts on his own. In...

Last reply: Scott Bowman, Jul 18, 2013, 12:38 pm

guestrooms keycard: power adjustment for automatic lighting ctrl

NC-2009 EAc1: Optimize Energy Performance
posted by Habitech Distretto Tecnologico Trentino on Feb 27, 2013, 8:57 am

This project is a hotel: guestrooms are provided with keycards, so when guestrooms are not occupied all lighting fixtures are automatically shut-off. Can credits be taken in the proposed case for...

Last reply: Marcus Sheffer, Mar 21, 2018, 2:39 pm

Choose the right one?

NC-2009 EAc1: Optimize Energy Performance
posted by Robert Sutton on Apr 30, 2013, 2:09 pm

Determine the interior lighting power allowance by
using the columns designated Space-by-Space Method
in Table 9.6.1. Multiply the floor area(s) of the space(s)
times the...

Last reply: Robert Sutton, Apr 30, 2013, 10:18 pm

LEED v2009 NC Total Daily Occupancy

NC-2009 PIf3: Occupant and Usage Data
posted by A Commings on Jun 3, 2013, 10:25 am

I have a residential dormitory project with some questions on Table Plf3-3 Total Daily Occupancy. A majority of the building is residential, with a lower level Lobby/Lounge area (Reception and...

Last reply: Jennifer Greenlee, Nov 8, 2017, 2:11 pm

High Rise Residential- smoke detector/CO2 mon. combined device?

NC-2009 IEQc1: Outdoor Air Delivery Monitoring
posted by Abena Darden on Aug 23, 2013, 8:39 pm

Hi All -- I see my question might already be partially answered in the conversation from May 28, 2013. Here's the question: Because the 250 residential units in our project are non-densely...

Last reply: Abena Darden, Dec 12, 2013, 1:37 pm

IEQp1

NC-2009 IEQp1: Minimum indoor air quality performance
posted by Adi Negara, LEED AP BD+C on Aug 27, 2013, 8:47 am

Hello,

Our project is to build a two-story office building in Indonesia. For cooling, the building will be served by AC using VRF system (ceiling cassette) in each designated space that...

Last reply: Dionisio Franca, Mar 7, 2018, 7:48 pm

Default fixture usage- showers in a swimming pool facility

NC-2009 WEp1: Water Use Reduction
posted by Ricardo Sá on Nov 21, 2013, 9:46 am

In a swimming pool facility it is very likely that almost all users do take a shower before leave. However, the default fixture use for showers defined in LEED implies that only about 10% of all...

Last reply: Ricardo Sá, Jan 13, 2014, 4:39 am

Kitchen Make-up air unit

NC-2009 EAp2: Minimum Energy Performance
posted by Anil Bhari on May 15, 2014, 9:58 am

Is Make-up air unit considered as process load?
Since kitchen has its own cooling and heating system. Can i Model MAU in certain schedule to consider gas and electricity consumption (...

Last reply: Marcus Sheffer, May 23, 2014, 12:55 pm