Topic | Recent |
---|---|
LEED Interpretation: get recycled content figures by plantNC-2009 MRc4: Recycled Contentposted by Tristan Roberts on Oct 31, 2012, 10:06 am
LEED Interpretation #10246, out on 10/1/12, makes a pretty big change to documentation requirements for MRc4 (effective for... Last reply: Tristan Roberts, Jan 30, 2013, 12:02 pm |
|
ISO 140001 CertificationNC-2009 IDc1: Innovation in Designposted by kathy zarsky on Nov 27, 2012, 6:45 pm
Has anyone had any success in receiving an innovation credit point for this with LEED version 2009? Last reply: Anna Foden, Dec 18, 2020, 12:28 pm |
|
CxA contracting for enhanced commissioning in a design&build proNC-2009 EAc3: Enhanced Commissioningposted by Valentin Grimaud on Nov 29, 2012, 7:38 pm
Dear All, We have a 300,000sqft project, quite technical facility. It is a design&build contract and the owner is reluctant on taking independent contracts on his own. In... Last reply: Scott Bowman, Jul 18, 2013, 12:38 pm |
|
guestrooms keycard: power adjustment for automatic lighting ctrlNC-2009 EAc1: Optimize Energy Performanceposted by Habitech Distretto Tecnologico Trentino on Feb 27, 2013, 8:57 am
This project is a hotel: guestrooms are provided with keycards, so when guestrooms are not occupied all lighting fixtures are automatically shut-off. Can credits be taken in the proposed case for... Last reply: Marcus Sheffer, Mar 21, 2018, 2:39 pm |
|
Choose the right one?NC-2009 EAc1: Optimize Energy Performanceposted by Robert Sutton on Apr 30, 2013, 2:09 pm
Determine the interior lighting power allowance by Last reply: Robert Sutton, Apr 30, 2013, 10:18 pm |
|
LEED v2009 NC Total Daily OccupancyNC-2009 PIf3: Occupant and Usage Dataposted by A Commings on Jun 3, 2013, 10:25 am
I have a residential dormitory project with some questions on Table Plf3-3 Total Daily Occupancy. A majority of the building is residential, with a lower level Lobby/Lounge area (Reception and... Last reply: Jennifer Greenlee, Nov 8, 2017, 2:11 pm |
|
High Rise Residential- smoke detector/CO2 mon. combined device?NC-2009 IEQc1: Outdoor Air Delivery Monitoringposted by Abena Darden on Aug 23, 2013, 8:39 pm
Hi All -- I see my question might already be partially answered in the conversation from May 28, 2013. Here's the question: Because the 250 residential units in our project are non-densely... Last reply: Abena Darden, Dec 12, 2013, 1:37 pm |
|
IEQp1NC-2009 IEQp1: Minimum indoor air quality performanceposted by Adi Negara, LEED AP BD+C on Aug 27, 2013, 8:47 am
Hello, Our project is to build a two-story office building in Indonesia. For cooling, the building will be served by AC using VRF system (ceiling cassette) in each designated space that... Last reply: Dionisio Franca, Mar 7, 2018, 7:48 pm |
|
Default fixture usage- showers in a swimming pool facilityNC-2009 WEp1: Water Use Reductionposted by Ricardo Sá on Nov 21, 2013, 9:46 am
In a swimming pool facility it is very likely that almost all users do take a shower before leave. However, the default fixture use for showers defined in LEED implies that only about 10% of all... Last reply: Ricardo Sá, Jan 13, 2014, 4:39 am |
|
Kitchen Make-up air unitNC-2009 EAp2: Minimum Energy Performanceposted by Anil Bhari on May 15, 2014, 9:58 am
Is Make-up air unit considered as process load? Last reply: Marcus Sheffer, May 23, 2014, 12:55 pm |