Forum quick links
Walk off mats required at terrace entrances?
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Carly Ruggieri on
One of my residential projects will have terraces on a few floors that are accessible to occupants (part of the amenity spaces).
Historic Building Limitations
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Todd Bundren on
Has anyone been successful with a variance on the 10'-0" walk off-matt rule based on the limitations of a historic building? My building has an 8'-0" vestibule at the 2 main entrances.
Purchasing Wood prior to Obtaining CoC Certificate
NC-2009 MRc7:Certified Woodposted by Maya Karkour on
Hello, Can we count FSC wood products if their supplier obtained the CoC certificate after selling them to the project contractor? In other words, the Contractor purchased wood several months ago
Green Data Center
NC-2009 EAc1:Optimize Energy Performanceposted by Jatuwat Varodompun on
Does anyone know about the modeling baseline of the a data center. Can we use 90.1 or do we have to use something else?
Healthcare Prereq 1 Fixtures and Calcs
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Derek Sylvia on
This is my first time doing the LEED paperwork. I'm not sure I'm using all the correct fixtures while filling out prereq 1. Currenly I only have water closets and lavs filled out.
EA credit 3.2 & EA Pre-requisite 1- Submetering
EBOM-2009 EAp1:Energy Efficiency Best Management Practicesposted by Paola Figueiredo, Newton Figueiredo on
Please, We are not pursuing the credit EA - 3.2 - System Level Metering, therefore how can we estimate a project energy consumption divided by categories (for EA Pre-Requisite 1) if it doesn't have
EQp2 Residential Buildings that Allow Smoking Testing
EBOM-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Joanne Sawatzky on
Wondering the testing requirements (blower door) for residential buildings that allow smoking in the suites. Do we have to test every suite or just 10% of the first x and 5% of the remaining x?
Existing renovated and no renovated as part of a CS2009
CS-2009 EAp2:Minimum Energy Performanceposted by Therese Malm on
Hi, We our working in a CS2009 project where ca 20% of the total gross area of the building is existing construction and the rest is new contrustion.
On Site Renewable energy double dip
NC-2009 EAc6:Green powerposted by Todd Bundren on
My client is producing enough energy on-site (solar) to get all the points in EAc1 and EAc2 with a large surplus of renewable energy.
Re: Review Comments with Phantom Requirements
posted by David Posada on
Michelle - see the reply to your post at EQp2: https://www.leeduser.com/credit/NC-v2.2/EQp2#comment-22021