Understanding how hazardous materials effect calculationsNC-2009 MRc2: Construction Waste Managementposted by Renee Shirey on May 31, 2011, 5:28 pm
Scenario: select asbestos-containing material (ACM) to be left in exist. bldg (and is allowed to be) and will be handled during demolition. If it is not selectively/carefully demo'd, the ACM... Last reply: RETIRED, Mar 11, 2013, 6:43 pm |
|
Islamic Water ClosetsEBOM-2009 WEp1: Minimum Indoor Plumbing Fixture and Fitting Efficiencyposted by Jutta Berns on Jun 5, 2011, 1:44 pma fixture should be counted and there are a lot of conversations on how to account for various different populations in the other WE forums so I won't repeat that conversation. The foot baths I would... Last reply: Umesh Atre, Nov 16, 2023, 11:09 am |
|
FTE?EBOM-2009 IEQc2.1: Occupant comfort - occupant surveyposted by John Kinch on Jun 8, 2011, 2:54 pm
Hi there, I just wanted to confirm that for this particular credit we don't need to use... Last reply: Allison Beer McKenzie, Aug 1, 2013, 9:16 am |
|
No tenants?CS-2009 MRp1: Storage and Collection of Recyclablesposted by Sara Neff on Jun 8, 2011, 3:22 pm
I am confused on how to document the floorplan requirement for this prerequisite. We have an exterior centralized location that I've marked on the site plan, but this is a core &... Last reply: Michelle Rosenberger, Aug 30, 2012, 3:10 pm |
|
FSC Controlled labelNC-2009 MRc7: Certified Woodposted by mary ostafi on Jun 10, 2011, 10:06 am
LEED v3 clearly states that... Last reply: Kerry Little, Sep 10, 2011, 12:07 pm |
|
VOC limits declaration for European MaterialsCS-2009 IEQc4.1: Low-emitting materials - adhesives and sealantsposted by Alessio Zampaglione on Jun 13, 2011, 8:45 am
Can someone tell me some informations about using materials with... Last reply: Alessio Zampaglione, Jun 21, 2011, 6:08 am |
|
LEED LCA CalculatorPilot-Credits PC1: Life-Cycle Assessment (LCA) of Building Assemblies and Materialsposted by Kelly Roberts on Jun 22, 2011, 5:30 pm
The link to the LEED LCA Credit Calculator does not appear to be working anymore. Does anyone know why this is? Last reply: Susan Walter, Jul 7, 2011, 3:04 pm |
|
Waste Recycling AreaCI-2009 MRp1: Storage and Collection of Recyclablesposted by Seung Shin Na on Jun 28, 2011, 3:42 am
Our project boundary is limited to building only excluding land area. One problem is..waste collection area is installed outside. In this case, do we need to include this area into the LEED... Last reply: Steve Khouw, Jun 4, 2012, 10:30 pm |
|
How to get form SSc4.3 Option 4 to calculate a '0' FTE building?NC-2009 SSc4.3: Alternative transportation - low-emitting and fuel-efficient vehiclesposted by Bonnie Chiu on Jul 6, 2011, 7:10 pm
I'm pursuing Option 4-Vehicle Sharing Program for SSc4.3. My project is a student residential building in a college campus. From PI f3, I enter 171 as my total 'residents' number, and '0' for... Last reply: Michelle Rosenberger, Jul 11, 2011, 12:20 pm |
|
recycling versus incinerationNC-2009 MRc2: Construction Waste Managementposted by Jeff Jones on Jul 21, 2011, 10:36 am
I am receiving conflicting information regarding landfill diversion documentation and the ability to count materials that are used as a "fuel product" (paid for by... Last reply: Kathy Trejo, Jan 23, 2012, 1:03 pm |