Topic | Recent |
---|---|
Option 2: Is there an alternate compliance method being launced under LEEDv4.1NC-v4 SSc2: Site development - protect or restore habitatposted by Stacey Olson on Sep 18, 2018, 9:50 pm
It appears under LEEDv4.1 O+M, this credit was removed. We have a site that is 19.1 acres, which equates to a cost of $332,798.40 at $0.40 / sf - a substantial cost for 1 point. The... |
|
Regional material distance calculation methodCS-v4 MRc3: Building product disclosure and optimization - sourcing of raw materialsposted by Lawrence Rennell on Sep 19, 2018, 10:57 am
According to LEED 2009, there were alternate distance calculations available that applied to products shipped by rail or ship. These calculations were based on ratios established for each... |
|
GreenfieldNC-v4 SSc2: Site development - protect or restore habitatposted by Karl Heitman on Sep 19, 2018, 11:26 am
Our 18 acre project site includes non-build-able waterfront with water detention. The majority of the site was previously developed but they are all torn down and cleared many years ago. How do... |
|
Daylight- Option 2 Attached Furniture SystemsCI-v4 EQc7: Daylightposted by Amanda Gillen on Sep 19, 2018, 11:48 am
I am working on the documentation for Daylight using Option 2. The Credit form asks that you "describe attached furniture systems included in the simulations". What exactly are they refering to?... |
|
100% Outdoor air clarificationCS-v4 EQp1: Minimum indoor air quality performanceposted by Diego Prada on Sep 20, 2018, 6:11 pm
Hi, We are working on a Core and Shell Office project where there is a central air circulation system with natural ventilation, which has permanent openings in the facades, 24 hours a day... |
|
Small Project BoDCI-2009 EAp1: Fundamental Commissioning of Building Energy Systemsposted by Claire Cowling on Sep 24, 2018, 1:26 pm
I picked up a project in my firm after the first review was compelted. It seems that a BoD was never created for this project, as it is very small and the... |
|
Amount of Testing LocationsNC-2009 IEQc3.2: Construction IAQ management plan - before occupancyposted by cristina algaze beato on Sep 24, 2018, 5:32 pm
Greetings: We will be seeking this credit through Air Testings. In our case the amount of separate ventilation systems is the one that will determine the amount of air testing locations. My... |
|
Bio-based materialsRetail-CI-v4 MRc4: Building product disclosure and optimization - sourcing of raw materialsposted by Kena David on Sep 24, 2018, 6:54 pm
Owens Corning claims its EcoTouch products to be certified under the... |
|
Guidance on Material and resource categoryNC-v4 MRc2: Building product disclosure and optimization - environmental product declarationsposted by Vibha Pai on Sep 24, 2018, 8:54 pm
Hello, Thank you everyone who took the survey that I had posted sometime ago, and those who gave me valuable insights while I was doing my research. Below is the link to my masters thesis... |
|
Heat pump with apx 4 kg of refrigerantNC-2009 EAc4: Enhanced Refrigerant Managementposted by Maria Porter on Sep 26, 2018, 6:04 am
Hi! I can see that similar questions have been asked before, but I can’t find any answers: It is an early stage and we are looking at heating solutions for a project. They will... |