NC Certification started - considering reducing scope

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Robert Cannellos  on 

My project has completed design review, and construction is nearly complete. Owner has occupied the building.

2
Default Avatar
Sustainability Consultant
Dagher Engineering
LEEDuser Basic Member
51 thumbs up
Mon Jul 8, 2013, 5:44 pm

E Cigarettes

EBOM-2009 IEQp2:Environmental Tobacco Smoke (ETS) Control
posted by  Robin Obaugh  on 

Has there been any commentary on whether how "e-cigarettes" align or do not align with the intent of this credit?

2
LEED AP BD+C, O+M, Green Globes Professional
JLL
LEEDuser Basic Member
112 thumbs up
Mon Jul 8, 2013, 4:33 pm

1/4 Mile Walking Distance - Crosswalks

NC-2009 SSc4.1:Alternative Transportation—Public Transportation Access
posted by  Mark Hirschi  on 

I am working on a project that is on a busy road. There are a couple of bus stops (two different routes) on the other side of this road from my project.

2
Mon Jul 8, 2013, 3:58 pm

recirculation

NC-2009 EAc1:Optimize Energy Performance
posted by  jaume balana  on 

Is it mandatory to have recirculation (for a system 4)?

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Mon Jul 8, 2013, 3:00 pm

Project Registration and Design Submittal

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Gaston Viau  on 

It will be my first time registering a project so I have some doubts I would like to share with you. Our project is a NC commercial building.

3
b.i.g. Bechtold DesignBuilder Expert
LEEDuser Basic Member
581 thumbs up
Mon Jul 8, 2013, 1:37 pm

Adhesive category for Foster 85-20

NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  cathy keagle  on 

What is the appropriate category for Foster 85-20? Our contractor told us that it was Special Purpose Contact Adhesive. And how do we verify this?

3
Mon Jul 8, 2013, 1:10 pm

Defining the baseline

NC-2009 EAc5:Measurement and Verification
posted by  Gustav Alfaro  on 

Hi to all: Please help me to clarify how the baseline model is defined for the M&V plan, it is clear that for the "actual case" the proposed model created for the EAc1 must be calibrated based

5
Default Avatar
Mechanical Engineer
LEEDuser Basic Member
10 thumbs up
Fri Jul 5, 2013, 4:56 pm

With Specialty expired

General forums
posted by  Bill Swanson  on 

I know several people who opted in but never completed the 30 hours of continuing education in the required 2 year period and now have expired specialties.

16
Default Avatar
Mechanical Engineer
AECOM
LEEDuser Basic Member
0 thumbs up
Fri Jul 5, 2013, 3:41 am

LEED Interpretation #10134 as applied to fan coils

CI-2009 EAc1.3:Optimize Energy Performance—HVAC
posted by  Silvia Ruiz  on 

Hi, Would a project be eligible to apply for this credit if the scope of work includes the provision and installation of 100% of the fan coils serving the certifiable space, even if they don't ha

5
Default Avatar
Civil Engineer & Sustainability Coordinator
Studio Domus
LEEDuser Basic Member
7 thumbs up
Thu Jul 4, 2013, 6:33 pm

EP Confusion re: SS C3.1,.3.2, and 3.3

CI-2009 SSc3.1:Credit Alternative Transportation—Public Transportation Access
posted by  Elizabeth Ingram  on 

Hi Tristan! I am studying for the LEED 2009 ID+C and am confused regarding the graphics for the above credits and the way the EP is mentioned. They seem to differ.

2
Default Avatar
VP of Innovation
Sustainable Investment Group
LEEDuser Basic Member
110 thumbs up
Thu Jul 4, 2013, 6:17 pm