Forum quick links
NC Certification started - considering reducing scope
posted by Robert Cannellos on
My project has completed design review, and construction is nearly complete. Owner has occupied the building.
E Cigarettes
EBOM-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Robin Obaugh on
Has there been any commentary on whether how "e-cigarettes" align or do not align with the intent of this credit?
1/4 Mile Walking Distance - Crosswalks
NC-2009 SSc4.1:Alternative Transportation—Public Transportation Accessposted by Mark Hirschi on
I am working on a project that is on a busy road. There are a couple of bus stops (two different routes) on the other side of this road from my project.
recirculation
NC-2009 EAc1:Optimize Energy Performanceposted by jaume balana on
Is it mandatory to have recirculation (for a system 4)?
Project Registration and Design Submittal
posted by Gaston Viau on
It will be my first time registering a project so I have some doubts I would like to share with you. Our project is a NC commercial building.
Adhesive category for Foster 85-20
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by cathy keagle on
What is the appropriate category for Foster 85-20? Our contractor told us that it was Special Purpose Contact Adhesive. And how do we verify this?
Defining the baseline
NC-2009 EAc5:Measurement and Verificationposted by Gustav Alfaro on
Hi to all: Please help me to clarify how the baseline model is defined for the M&V plan, it is clear that for the "actual case" the proposed model created for the EAc1 must be calibrated based
With Specialty expired
posted by Bill Swanson on
I know several people who opted in but never completed the 30 hours of continuing education in the required 2 year period and now have expired specialties.
LEED Interpretation #10134 as applied to fan coils
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Silvia Ruiz on
Hi, Would a project be eligible to apply for this credit if the scope of work includes the provision and installation of 100% of the fan coils serving the certifiable space, even if they don't ha
EP Confusion re: SS C3.1,.3.2, and 3.3
CI-2009 SSc3.1:Credit Alternative Transportation—Public Transportation Accessposted by Elizabeth Ingram on
Hi Tristan! I am studying for the LEED 2009 ID+C and am confused regarding the graphics for the above credits and the way the EP is mentioned. They seem to differ.