Forum quick links
FTE?
EBOM-2009 IEQc2.1:Occupant Comfort—Occupant Surveyposted by John Kinch on
Hi there, I just wanted to confirm that for this particular credit we don't need to use FTE? We have a small staff here - 18 total staff members, only 6 of whom are full-time.
100% Recycled Fiber
EBOM-2009 IEQc3.3:Green Cleaning—Purchase of Sustainable Cleaning Products and Materialsposted by Elizabeth Felder on
Our building purchases generic toilet tissue and paper towels that state "100% recycled paper product" and "100% recycled fiber" on the box.
Credit Requirements
Pilot-Credits MRpc61:Material disclosure and assessmentposted by Catherine Blakemore on
What exactly are the credit requirements? I read through the reference Pilot Credit 43 and also what I could find ON CEN (EN) standard 15804.
LEED CI for Retail WEp1
EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiencyposted by Blythe Jopling on
Our store is located in a shopping mall where customers have no access to WCs in the shop, but use the WCs provided within the main shopping mall.
Mutiple Critical Zones
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Judith O'Driscoll on
Our review comments indicate that we need to show multiple critical zones for certain AHU but the ASHRAE 62.1 calculator seems to only allow input for 1 critical zone. How do I add additional?
Distance calculation
EBOM-2009 MRc5:Sustainable Purchasing—Foodposted by Magda Aghababyan on
Hi, In a situation where we buy a certain product from a retail supplier who is within the 100 mile radius, but the actual manufacturer is outside that limit is it still possible to pursue this cre
Period & time of Breakdown
EBOM-2009 EAc3.2:Performance Measurement—System-Level Meteringposted by Alexa Stone on
Hi all, I'm confused about when OR over what period of time does the breakdown need to capture. I understand that it needs to roll up to the EAc1 declared annual energy use (mbtu).
Effective Daylit Zones
NC-2009 EAp2:Minimum Energy Performanceposted by Maya Karkour on
Dear All, I want to model daylighting sensors for an open plan office.
Calculating Accurate FTE Value
posted by Elizabeth Felder on
The project is a high rise commercial building, going for EBOM certification. The number we have for FTEs is outdated, as of about a year ago.
Multi-occupant space with workstations
NC-2009 IEQc6.1:Controllability of Systems—Lightingposted by Courtney Royal on
I have a space in a University Commons building which will be used primarily as a meeting, planning space.