Ready made concrete elements

NC-2009 MRc4:Recycled Content
posted by  Lise Dannesboe  on 

Hej! Do ready made concrete elements that are delivered on site count as assembly while in concrete that is cast on site the concrete and steel are two materials? Thanks!

3
Sustainability Manager
COWI
LEEDuser Premium Member
54 thumbs up
Fri Aug 16, 2013, 2:15 pm

Insulation

CI-2009 EAc1.3:Optimize Energy Performance—HVAC
posted by  Catalina Caballero  on 

Our project consist in a conversion from a warehouse to a university. but only part of the univeristy is being certified.

4
Fri Aug 16, 2013, 12:51 pm

retail portion less than 10% of total SF in mixed-use building

NC-2009 PIf3:Occupant and Usage Data
posted by  Courtney Royal  on 

According to Interpretation #10209, issued 7/1/2012, it says that if a non-residential SF of a mixed-used building is less than 10% or no greater than 5,000 SF, it is acceptable for the non-residen

2
Integrated Design & LEED Specialist
SERA Architects
LEEDuser Expert
1361 thumbs up
Thu Aug 15, 2013, 1:37 pm

Option 2: Insulation for Baseline and Proposed

CI-2009 EAc1.3:Optimize Energy Performance—HVAC
posted by  Saju Varghese  on 

Under "LEED Project Submittal Tips: Commercial Interiors 2009", the guide is referencing to Table G3.1-5(F) when applicable for baseline and propose values consistent with Appendix A.

5
SUSTAINABILITY COORDINATOR
JALRW Eng. Group Inc.
LEEDuser Basic Member
24 thumbs up
Thu Aug 15, 2013, 1:17 pm

Enough for credit compliance

CS-2009 IEQc6:Controllability of Systems—Thermal Comfort
posted by  Mathilda Jonsson  on 

Hi all! My CS project is an office building.

5
Thu Aug 15, 2013, 5:55 am

How do we qualify for offsite salvaged materials?

EBOM-2009 MRc2:Sustainable Purchasing—Durable Goods
posted by  Katherine Ann Resurreccion  on 

Hello! Our client, (the project owner) has a branch office from another country wherein there are bulk of furniture which were transported 3 years ago to our recently registered LEED project.

4
Project Director
WSP USA
LEEDuser Basic Member
381 thumbs up
Thu Aug 15, 2013, 2:19 am

IEQc4 Compliance for Sustainably Sourced Materials

Healthcare-v2009 MRc3:Sustainably sourced materials and products
posted by  Catherine Blakemore  on 

So the first AND in this credits as follows: Wall, ceiling and flooring systems and finishes, composite wood, agrifiber and fiberglass products, both exterior and interior adhesives, sealants, coa

3
Wed Aug 14, 2013, 11:00 pm
4
Wed Aug 14, 2013, 10:25 pm

Mixed use meter

EBOM-2009 EAc3.2:Performance Measurement—System-Level Metering
posted by  Alicia Villanueva  on 

We have a meter that measures: chiller + pump + lighting system. Since we are not discriminating by "end use": would this meter qualify towards this credit? Thanks GH

5
Senior Tax Accountant
Ernst & Young
LEEDuser Basic Member
4 thumbs up
Wed Aug 14, 2013, 9:31 pm

Shading Devices in Baselin - Option 2. Energy Model.

CI-2009 EAc1.3:Optimize Energy Performance—HVAC
posted by  Saju Varghese  on 

Im a bit confused whether to use overhangs or not in the baseline of the energy model for option 2.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Wed Aug 14, 2013, 7:19 pm