DES or NO DES?

NC-2009 EAp2: Minimum Energy Performance
posted by Aru Sau on Oct 13, 2017, 11:09 am

In this project, we have one office, two plants signed up for LEED Campus. Cooling & Heating for these plant buildings comes from Chillers & Boilers located in centrally located plant in...

Last reply: Marcus Sheffer, Oct 17, 2017, 10:49 am

Minimum Energy Performance Calculator- Required for Option 2?

CI-v4 EAp2: Minimum Energy Performance
posted by Oliver Bate on Oct 25, 2017, 8:07 am

Hi,

I have a number of small budget projects (which are not performing energy modelling) targetting Option 2 Pescriptive Compliance for Min. Energy Performance. As such the ASHRAE req,...

Last reply: Marcus Sheffer, Oct 14, 2020, 10:00 am

Non-occupied Garage- Flush required?

NC-v4 EQc4: Indoor air quality assessment
posted by Leanne Conrad on Oct 26, 2017, 2:11 pm

If we have a separaetly HVAC served storage garage that is quite large and mimininally heated, does this area have to be included in the whole building flush and maintain the higher than normal...

Last reply: Dave Hubka, Jun 14, 2023, 2:57 pm

CBECS Data for the project without non-electricity fuel?

CI-v4 EAc6: Green power and carbon offsets
posted by Seth Lai on Oct 30, 2017, 10:17 pm

The project is a CI retail project that only use electricity as energy supply. And we are going to use...

Last reply: Marcus Sheffer, Apr 11, 2018, 1:10 pm

Humidity control- "Unmet humidity load hours"

NC-2009 EAp2: Minimum Energy Performance
posted by Luis Andrade on Oct 31, 2017, 1:53 pm

Hi all,

I've been reading some of the previous comments about the humidity controls (both humidification and dehumidification). Am I correct to assume:

a) Humidification must be...

Last reply: Marcus Sheffer, Nov 6, 2017, 12:37 pm

Sub-metering Required?

NC-2009 EAc5: Measurement and Verification
posted by Dave Hubka on Nov 3, 2017, 5:17 pm

Hello,
We typically implement Option D of...

Last reply: Marcus Sheffer, Nov 6, 2017, 2:56 pm

Innovation Credits in v4

NC-v4 INc1: Innovation
posted by Lissa Spitz on Nov 10, 2017, 10:58 am

Hi all, I see that several of the old faithful innovation credits are still available in v4, but when I search actual v4 certified projects, I can't find a single one shown on their scorecards. ...

Last reply: Trista Brown, Dec 12, 2017, 6:28 pm

Can the Projects Fundamental CxA be an employee of the Mechanical Design firm, but not part of MEP Design Team?

NC-v4 EAp1: Fundamental commissioning and verification
posted by marc myers on Nov 11, 2017, 9:47 pm

  • The...

Last reply: Scott Bowman, Dec 15, 2017, 12:48 pm

Restaurant: LEED V4 ID+C Commercial Interiors or LEED V4 ID+C Retail?

LEED Rating System Selection
posted by Javier Manzanero on Nov 14, 2017, 7:52 am

Hi!

I'm registering a project about a restaurant, and I'm not sure if I have to use LEED V4 ID+C Commercial Interiors or LEED V4 ID+C Retail.

I don...

Last reply: Tristan Roberts, Oct 17, 2019, 4:12 pm

OPR and BOD documents

NC-2009 EAp1: Fundamental Commissioning of Building Energy Systems
posted by Carlos Vazquez on Dec 1, 2017, 12:36 pm

I accepted an assignment of...

Last reply: emily reese moody, Oct 24, 2018, 4:17 pm