Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Energy Star shutdown

EBOM-2009 EAc1:Optimize Energy Performance
posted by  Trista Brown  on 

Hi all Heads up that Energy Star's Portfolio Manager website will be completely unavailable from midnight June 26 through July 10!!

3
Default Avatar
President
Weatherby Design & Co. Engineers
LEEDuser Basic Member
67 thumbs up
Tue Aug 6, 2013, 4:12 pm
14
Tue Aug 6, 2013, 2:20 pm

Master site credits applicabilty

LEED Guidance for Campuses and Multiple Buildings
posted by  Marcio Alberto Casado Pereira  on 

We have a campus with 9 buildings elegible to seek LEED but only some of them will seek the certification (we are still deciding which ones).

4
Technical Customer Service Specialist
GBCI
LEEDuser Basic Member
105 thumbs up
Tue Aug 6, 2013, 2:18 pm

Multiple Zone or 100% OA (fancoil to outside air)

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Marina Andrade  on 

Hi! I have a project where a fan coil is providing outside air (outside air treated) to other fancoils. How do I enter this fan coil (outside air) on the worksheet 62MZCalc? Must indicate in mul

7
Tue Aug 6, 2013, 1:43 pm

Simulation on the 21 of september

NC-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Xavier Bigot  on 

Hi! I was wondering why does LEED require to run a simulation on the 21st of september? It also requires to perform the simulation during a clear sky condition.

6
Tue Aug 6, 2013, 12:44 pm

Pollutant Management Plan

CS-2009 SSc6.2:Stormwater Design—Quality Control
posted by  Michelle Xuereb  on 

As part of this credit, LEED Canada 2009 requires the owner to implement a management plan to minimize pollution and eutrophication of waterways from excess nutrient pollutants such as nitrogen and

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Tue Aug 6, 2013, 12:43 pm

Derated Insulation

NC-2009 EAp2:Minimum Energy Performance
posted by  Todd Bundren  on 

I had a response from an energy model reviewer indicating my r-value calculations are not acceptable because we failed to derate the 3.5" R-11 batt insulation per Table A9.28B of ASHREA 90.1-2007.

5
Associate Principal - Director of Sustainabilty
Lawrence Group
LEEDuser Premium Member
10 thumbs up
Tue Aug 6, 2013, 7:02 am

Recycled Content % Not Specified as Pre- or Post-Consumer

EBOM-2009 MRc1:Sustainable Purchasing—Ongoing Consumables
posted by  American University  on 

Several of the toner cartridges that our buildings routinely buy claim to have recycled content, but their product documentation does not specify whether it is post-consumer or post-industrial mate

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Tue Aug 6, 2013, 6:39 am

Exemplary Performance, Point 2

NC-2009 IEQc8.2:Daylight and Views—Views
posted by  Sara Zoumbaris  on 

Hi All, We are interested in attempting the exemplary performance point 2 for this credit on a five story collegiate residence hall.

16
Mon Aug 5, 2013, 7:37 pm

Iconic Building with two layers of Facade

NC-2009 PIf2:Project Summary Details
posted by  Ahmed Mosa  on 

We are currently working on the design of an iconic building that has 2 layers of facade.

3
Sustainability Consultant - Sustainable Design Researcher
P&T Architects and Engineers
LEEDuser Basic Member
8 thumbs up
Mon Aug 5, 2013, 6:27 pm