Hi - when doing the calculations for option 1 - should i include the sf of the project (ie tenant space) or the whole building - then divide it by the area. The project uses 10 floors of a 30 floor existing building - either way the calculation will be more than 60,000sf but i am unsure which figure to use.

thanks