2 Pipe Fan Coil System

NC-2009 EAc1:Optimize Energy Performance
posted by  Donald Green  on 

We have a project where the team came to us after the fact and are asking about LEED certification. They have already installed a 2 pipe fan coil system.

4
LEED Fellow
Integrated Design + Energy Advisors, LLC
LEEDuser Expert
377 thumbs up
Wed Oct 2, 2013, 7:02 pm

More option D vs option B

NC-2009 EAc5:Measurement and Verification
posted by  Thomas Huang  on 

Thank you for this very helpful forum. I have read every comment on EAc5 as I prepare to submit our first M&V plan.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Wed Oct 2, 2013, 12:38 pm

Content of mechanical schedule

NC-2009 PIf4:Schedule and Overview Documents
posted by  Michael Haugeneder  on 

Does the requirement for PIf4: mechanical schedule refer to the provision of MEP plans or simply to HVAC plans?

5
Wed Oct 2, 2013, 7:50 am

Constant volume system in some areas, VAV in others

NC-2009 IEQc1:Outdoor Air Delivery Monitoring
posted by  Muhammad Faisal Azizullah Jaffar  on 

Hello, my project is a campus golf course community project in Qatar. One of the buildings in the master site, the clubhouse, is mixed-use: part hotel, part retail, part restaurants etc.

3
LEED AP BD+C, O+M, Green Globes Professional
JLL
LEEDuser Basic Member
112 thumbs up
Tue Oct 1, 2013, 6:31 pm

Clarification

CS-2009 EAc5.2:Measurement and Verification—Tenant Submetering
posted by  Leandro Silva  on 

Please help with this scenario: Core and Shell project with 8 tenants (light manufacturing). Goal of achieving EAc5.1 and EAc5.2. The developer will meter total energy use of the Core areas and a

4
Regional Director
Horizon Engineering Associates
LEEDuser Premium Member
40 thumbs up
Tue Oct 1, 2013, 1:38 pm

LEED Matrix

NC-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Oleg Petryuchenko  on 

we have some spaces that excluded from 8.1 according to matrix such as lobby, brake room.. but they are properly daylit (10-500fc) based on AGI calcs.

3
Mon Sep 30, 2013, 9:31 pm

Future development in the same LPB

NC-2009 SSc7.1:Heat Island Effect—Non-Roof
posted by  Marcio Alberto Casado Pereira  on 

Hi folks, In need of some light on a review we received. We have a multiple buldings Project. there are 4 LPBs inside of the LCB.

2
Mon Sep 30, 2013, 7:24 pm

District heating/cooling and On-site renewables

ND-v2009 GIBc12:District heating and cooling
posted by  Colin Day  on 

Hello Eliot, The project I am working on is a mixed-use (mostly residential) neighborhood. There will be solar PV on every home as well as ground source heat pumps.

4
LEED AP-ND, Principal
Criterion Planners
LEEDuser Expert
231 thumbs up
Mon Sep 30, 2013, 4:38 pm

How can I provide blower door test results before occupancy?

NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Control
posted by  adi ashkenazi  on 

Hi, On the credit form I must upload blower door test results but this credit is a design phase credit and the test is only after construction is complete.

3
Fri Sep 27, 2013, 8:58 pm
3
Default Avatar
Senior Sustainability Consultant
Steven Winter Associates, Inc.
LEEDuser Basic Member
72 thumbs up
Fri Sep 27, 2013, 6:30 pm