Forum quick links
Baseline equal to zero
ND-v2009 GIBp3:Minimum building water efficiencyposted by Karyn Rodrigues on
Hi, I have three buildings within the LEED ND boundary, and one of them is not going to pursue any green building certification.
ID credit: Aluminum form-work system
NC-2009 IDc1:Innovation in Designposted by Eric Carter on
Our contractor would like us to consider attempting an Innovation credit for their use of an aluminum form-work system for all of the tilt-up concrete elements built in the project: the intent of t
Exhuast fan and 62.1 compliance
NC-2009 IEQp1:Minimum IAQ Performanceposted by Jatuwat Varodompun on
If we use an exhuast fan for an office and have no clear location of OA intake, can we comply with 62.1?
Tenant design and construction guidelines- CS Sc9
posted by Noriko Nagazumi on
Hi All, Th Appendix A - AGMBC Applicability for Credits and Prerequisites in LEED 2009 Design & Construction Rating Systems describes a Mater Tenant Design and Construction Guideline for SSc9
Submit a Low Mercury ID Credit
NC-2009 IDc1:Innovation in Designposted by Joel Register on
I would like to use the EB: MRc4-low mercury bulb credit for an ID credit in a LEED-CI project. What is the process in in submitting this as an ID credit.
documentation issue
Pilot-Credits EApc56:Renewable energy - distributed generationposted by Noriko Nagazumi on
Hi, Our project will lend the rooftop to other company "A" which will install PV panels on the entire roof area and sell generated electricity to utility company. The contract between the project o
Incomplete Spaces
NC-2009 PIf1:Minimum Program Requirementsposted by Annalise Reichert on
I know that if there are incomplete spaces at the time of certification the owner needs to write a letter of commitment indicating the remaining spaces will satisfy LEED requirements.
PI form 2 vs Energy Simulation Floor Area
NC-2009 EAp2:Minimum Energy Performanceposted by Leandro Silva on
We have a conflict between the LEED floor area which clearly excludes underground parking (in our case) and the area of the energy simulation.
Separate lighting and plug load sub-metering
CS-2009 EAc5.1:Measurement and Verification—Base Buildingposted by Magnus Stagnäs on
Our client’s CS-project has been denied EAc5.2 because we haven’t provided separate sub-metering of tenant lighting and plug loads.
Hotel System 2 Reheat
NC-2009 EAp2:Minimum Energy Performanceposted by Michael Angell on
I am currently modeling a hotel with less than 20,000sqft (specifically 19720) of non-residential space.