Forum quick links
Tenant design and construction guidelines- CS Sc9
posted by Noriko Nagazumi on
Hi All, Th Appendix A - AGMBC Applicability for Credits and Prerequisites in LEED 2009 Design & Construction Rating Systems describes a Mater Tenant Design and Construction Guideline for SSc9
Submit a Low Mercury ID Credit
NC-2009 IDc1:Innovation in Designposted by Joel Register on
I would like to use the EB: MRc4-low mercury bulb credit for an ID credit in a LEED-CI project. What is the process in in submitting this as an ID credit.
documentation issue
Pilot-Credits EApc56:Renewable energy - distributed generationposted by Noriko Nagazumi on
Hi, Our project will lend the rooftop to other company "A" which will install PV panels on the entire roof area and sell generated electricity to utility company. The contract between the project o
Incomplete Spaces
NC-2009 PIf1:Minimum Program Requirementsposted by Annalise Reichert on
I know that if there are incomplete spaces at the time of certification the owner needs to write a letter of commitment indicating the remaining spaces will satisfy LEED requirements.
PI form 2 vs Energy Simulation Floor Area
NC-2009 EAp2:Minimum Energy Performanceposted by Leandro Silva on
We have a conflict between the LEED floor area which clearly excludes underground parking (in our case) and the area of the energy simulation.
Separate lighting and plug load sub-metering
CS-2009 EAc5.1:Measurement and Verification—Base Buildingposted by Magnus Stagnäs on
Our client’s CS-project has been denied EAc5.2 because we haven’t provided separate sub-metering of tenant lighting and plug loads.
Hotel System 2 Reheat
NC-2009 EAp2:Minimum Energy Performanceposted by Michael Angell on
I am currently modeling a hotel with less than 20,000sqft (specifically 19720) of non-residential space.
Group Project Grandfathered in as a single building
posted by John McLean on
We registered a project in 2009 as a single building prior to the publications of campus/multi-building application guide even through it is three buildings.
Interrupted view
CS-2009 IEQc8.2:Daylight and Views—Viewsposted by Frantisek Macholda on
Hello, we have project with facade consisting of horizontal lamellas and glazing between them - like steps. The glazing is almost from a floor to ceilings.
Lease Language
CS-2009 IEQc8.2:Daylight and Views—Viewsposted by Stella Hodgkins on
Does anyone have recent experience with this credit (GBCI review comments), as it relates to lease language?