Topic | Recent |
---|---|
SSc3 Brownfield DocumentationNC-2009 SSc3: Brownfield Redevelopmentposted by Josh Mauldin on Apr 11, 2011, 12:28 pm
Our project is the renovation of an existing building from 1955. No Phase II ESA was done, but we hired an environmental consultant to do an asbestos and lead paint survey. The report we got... Last reply: Larry Sims, Apr 12, 2011, 1:58 am |
|
LEED Interpretation 1600 for LEED-NC 2009?NC-2009 EAc1: Optimize Energy Performanceposted by Dana Kose on Mar 29, 2011, 4:08 pm
... Last reply: Colin Inderwish, Apr 11, 2011, 4:31 pm |
|
Occupancy Sensors in LPD CalculationsCI-2009 EAc1.1: Optimize energy performance - lighting powerposted by Jennifer Perdue on Apr 11, 2011, 12:33 pm
Has anyone had experience in calculating additional reduction in... Last reply: Jennifer Perdue, Apr 11, 2011, 3:27 pm |
|
Manufacturer's Stockpile MaterialCI-2009 MRc3.1: Materials Reuseposted by Gary Keyfauver on Apr 10, 2011, 4:52 pm
I work for a major precast/prestressed manufacturer. Our products are always designed, manufactured and installed for each individual project. However, we sometimes have a few units sent to... Last reply: David Posada, Apr 11, 2011, 12:45 pm |
|
Warehouse- Heating OnlyNC-2009 EAc1: Optimize Energy Performanceposted by Curt Pascoe on Apr 1, 2011, 4:14 pm
There has been much talk that warehouses with heating-only (no cooling) must still model a cooling system in the baseline and proposed case, since the space is defined as conditioned. Adding... Last reply: Curt Pascoe, Apr 11, 2011, 10:35 am |
|
Case 2 CalculatorsEBOM-2009 EAp2: Minimum Energy Efficiency Performanceposted by Walter Kanzler on Aug 13, 2009, 8:24 am
Is there any way to access case 2 calculators prior to registering for a project to determine feasibility? they are not in the reference guide? Last reply: Ambra Francisci, Apr 11, 2011, 6:31 am |
|
Performance PeriodEBOM-2009 EAp2: Minimum Energy Efficiency Performanceposted by Paul C on Oct 22, 2010, 2:51 pm
I believe I read somewhere or heard it in the Performance Period webinar that we can use an older energy star score even if it doesnt end within the same 30 day window as the rest of the other... Last reply: April Ambrose, Apr 8, 2011, 12:09 pm |
|
Building footprint vs. hardscapeNC-2009 SSc7.1: Heat island effect - nonroofposted by Erica Downs on Mar 31, 2011, 1:11 pm
Would entry stairs to the building be considered part of the building footprint, or part of the site hardscape? Thanks. Last reply: Tristan Roberts, Apr 8, 2011, 9:29 am |
|
Wall Panels, Tack Boards, Marker BoardsSchools-2009 IEQc4.6: Low-Emitting Materials—Ceiling and Wall Systemsposted by Cheryl Burkinshaw on Apr 7, 2011, 4:32 pm
We're all still struggling with this credit in our office and trying to determine whether or not we stand a change of getting this point, or if we should abandon it. In doing this, we are... Last reply: Josh Jacobs, Apr 8, 2011, 9:28 am |
|
vehicles not listed on ACEEE database- non U.S. projectEBOM-2009 SSc4: Alternative Commuting Transportationposted by Jutta Berns on Apr 5, 2011, 3:37 pm
we have just completed our transport survey and seem to have a lot of fuel-efficient vehicles, but most don't appear on the ACEEE list - simply because we tend to have models different from those... Last reply: Dan Ackerstein, Apr 7, 2011, 5:29 pm |