Remediation prior to project start date
NC-2009 SSc3:Brownfield Redevelopmentposted by Lauren Fakhoury on
Does anyone know if LEED defines a project start date for this credit? I am working on a project where there was some ACM identified and abated back in 2009.
removing a credit from submission
posted by KIMBERLY KRAFT on
Hello LEEDuser members, We are in the process of addressing comments from our Design and Construction Preliminary Review.
Existing Building vs. New Construction
NC-2009 EAc1:Optimize Energy Performanceposted by Jenelle Shapiro on
I am working on a project in Tokyo, Japan. They are considering saving part of the exitsing building structure for multiple reasons.
the minimum efficiency for the baseline case PTACs
CS-2009 EAp2:Minimum Energy Performanceposted by tiantian zhou on
Dear sir, Our LEED review of EAp2 said that the minimum efficiency for the Baseline Case PTACs should be 9.3 EER. I cannot understand it clearly and find the corresponding terms in 90.1.
Pilot credit 80 requirements are not clear
Pilot-Credits MRpc80:Environmentally preferable interior finishes and furnishingsposted by Helen Kessler on
The Pilot credit requirement is as follows: "Use at least 5 different third party certified products which account for at least 50% of the total interior finishes and furnishing materials by cost.
Long refrigeration line
NC-2009 EAc4:Enhanced Refrigerant Managementposted by Saju Varghese on
Should we include the manufacturers default information on refrigerant or should we use the actual refrigeration charged installed even though these are not installed and confirmed after installat
Thermal zone modeling
NC-2009 EAc1:Optimize Energy Performanceposted by Jatuwat Varodompun on
I have a building with two conditioned zones. One is dining and another is kitchen. Both zones has no wall and air can flow through each zone freely.
ASHRAE 90.1 2004 TABLE 6.8.1D
NC-2009 EAp2:Minimum Energy Performanceposted by Keerthi Ratnayake on
Hi, Our problem is with PTHP (cooling mode) new construction. The footnote 'c' is bit confusing.
Commisioning Exemplary Performance...
NC-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Rick Alfandre on
If we pursue fundamental commissioning, but not enhanced commissioning, can we still submit for an innovation in design or exemplary performance credit if we pursue a comprehensive envelope commiss
Can you submit Design Appeal after Construction?
posted by Nelina Loiselle on
On one of my projects we where only awarded 14 out of the 17 points we antcipated for EAc1.