Base building consumption breakdown

CS-2009 EAc5.1:Measurement and Verification—Base Building
posted by  František Bartoš  on 

Hello, is there any specification how should be consumption of base building divided and measured?

2
LEED Project Reviewer, LEED AP BD+C, Senior LEED Specialist
Certifications Department Manager, Epsten Group, Inc.
LEEDuser Basic Member
26 thumbs up
Fri Nov 15, 2013, 3:37 pm

Distinctions in Design Control

CS-2009 PIf5:Building System Control
posted by  Michelle Rosenberger  on 

What is the distinction between Owner/Developer, Tenant and Lease Amendment?

4
Fri Nov 15, 2013, 2:00 am

Question Regarding Process Loads

NC-2009 EAp2:Minimum Energy Performance
posted by  Brian Salazar  on 

Hello again! We are finalizing our model for a v3 Core and Shell Building Renovation. Our model is telling us that our process loads are under the requisite 25%, 23.66% to be exact.

5
President, LEED AP, WELL AP
Entegra Development & Investment, LLC
LEEDuser Premium Member
43 thumbs up
Thu Nov 14, 2013, 6:37 pm

water treatment outside LEED project boundary

NC-2009 WEc2:Innovative Wastewater Technologies
posted by  Adi Negara, LEED AP BD+C  on 

Dear all, We have a small LEED project (an office space with landscape) which located inside non-LEED construction project (factory), which will be conducted simultaneously.

3
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Thu Nov 14, 2013, 1:45 pm

Lighting in kWh?

CI-2009 EAc4:Green Power
posted by  Maria Porter  on 

The answer to this one might be obvious, but I just can’t see it: EAc4 form says to “Provide numbers that correspond with the information provided in EAp2 and EAc1.3”.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Thu Nov 14, 2013, 9:04 am

Excited to Meet Everyone!

General forums
posted by  Erika Duran  on 

Thanks for posting this Tristan. It's really interesting the community you and your team have built up. I will be happy to pass by - actually was interested in meeting and chatting with Mr.

4
Regional Stormwater Leader
Arcadis North America
LEEDuser Expert
144 thumbs up
Thu Nov 14, 2013, 1:23 am

How long must we follow thru on erosion control log?

NC-2009 SSp1:Construction Activity Pollution Prevention
posted by  Donald Bauman  on 

Our building and site is complete except for the grass. It was hydro-seeded last week but the grass that has taken is less than 75%.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Wed Nov 13, 2013, 9:18 pm

the area meet the requrement must the same area?

CS-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Shenhao Li  on 

Hi guys Please help me solve below three question 1.LEED Guidance required 75% of all regularly occupied spaces meet the daylight requirements at both 9 a.m.

3
Default Avatar
Atkins
LEEDuser Basic Member
7 thumbs up
Wed Nov 13, 2013, 8:59 pm

Filtering requirements

NC-2009 SSc6.2:Stormwater Design—Quality Control
posted by  Mike D  on 

If we capture rainwater and reuse it for irrigation, do we need to show any type of filtering or will this automatically acquire the credit?

12
Regional Stormwater Leader
Arcadis North America
LEEDuser Expert
144 thumbs up
Wed Nov 13, 2013, 7:36 pm

PI Form 3 occupancy question, transient student vs retail

NC-2009 PIf3:Occupant and Usage Data
posted by  Mike Stopka  on 

Hello I am submitting for a Multi-Family Residential apartment tower. It has retail space at the ground level.

4
Default Avatar
LEED Consultant
The Green Engineer
LEEDuser Basic Member
188 thumbs up
Wed Nov 13, 2013, 4:25 pm