Use of rainwater collected offsiteNC-2009 WEc2: Innovative Wastewater Technologiesposted by John Covello on Aug 2, 2013, 2:10 am
Our project is considering creating a retention pond for rainwater on land adjacent to the LEED project. They may develop the land where the pond is located so it cannot be included in the... Last reply: Amy Rider, Sep 25, 2013, 1:31 am |
|
Derated InsulationNC-2009 EAp2: Minimum Energy Performanceposted by Todd Bundren on Aug 5, 2013, 12:45 pm
I had a response from an energy model reviewer indicating my r-value calculations are not acceptable because we failed to derate the 3.5" R-11 batt insulation per Table A9.28B of ASHREA 90.1-2007... Last reply: Jean Marais, Aug 6, 2013, 3:02 am |
|
Does LEED AP/GA Count?Pilot-Credits IPpc81: Green training for contractors, trades, operators and service workersposted by Ara Massey on Aug 13, 2013, 12:13 pm
If the Qualifying Contractors, Subcontractors, and Building Trades have passed the LEED AP or GA test does that meet the requiremetns of this Pilot Credit? Last reply: Heather DeGrella, Mar 19, 2014, 12:15 pm |
|
VRP calculations for multi-family buildingsNC-2009 IEQp1: Minimum indoor air quality performanceposted by Courtney Royal on Aug 13, 2013, 2:47 pm
Hello, Our building is a multifamily building project and my question is, are we still required to complete the VRP calculations for this prerequisite? Based on the reference guide, it... Last reply: Courtney Royal, Aug 21, 2013, 3:47 pm |
|
Building Facade lighting- ASHRAE Baseline valuesNC-2009 EAp2: Minimum Energy Performanceposted by Maya Karkour on Aug 14, 2013, 12:06 pm
Dear All, I'm looking at Table 9.4.5 of ASHRAE 90.1-2007 which lists the maximum allowable LPDs for building exteriors. For building facade lighting, the table reads as follows: "0.... Last reply: Marcus Sheffer, Apr 8, 2015, 9:47 am |
|
Option 2: Insulation for Baseline and ProposedCI-2009 EAc1.3: Optimize energy performance - HVACposted by Saju Varghese on Aug 14, 2013, 4:05 pm
Under "LEED Project Submittal Tips: Commercial Interiors 2009", the guide is referencing to Table G3.1-5(F) when applicable for baseline and propose values consistent with Appendix A. Is this... Last reply: Tony Ricketts, Aug 15, 2013, 9:17 am |
|
Existing 1MW PV Array feeding new LEED Project on CampusNC-2009 EAc2: On-Site Renewable Energyposted by Greg Kight on Aug 22, 2013, 7:51 pm
My project is a LEED v2.2 NC 32,000 sf project going for an 'individual' certification on a campus of existing buildings (None others are certfied or pursuing certification). We are told that... Last reply: Greg Kight, Aug 23, 2013, 3:40 pm |
|
campus energy plantCS-2009 EAp2: Minimum Energy Performanceposted by charles bell on Aug 24, 2013, 3:56 pm
Our LEED review of EAp2 seems to indicate that we cannot model the central plant and have to use “purchased chilled water” for both the baseline and proposed. When this change is made all of the... Last reply: Marcus Sheffer, Aug 29, 2013, 1:56 pm |
|
Land Trusts and Land Use Restriction AgreementsCS-2009 SSc5.1: Site development - protect or restore habitatposted by Colin Twohig on Aug 28, 2013, 10:23 pm
We have a project that is going for LEED Core and Sheel v2009 certification in a densely populated urban area and needs to pursue some form of contractual interaction with a... Last reply: Theresa Backhus, Jul 28, 2014, 12:34 pm |
|
Need For Automated ShadesCS-2009 IEQc8.1: Daylight and views - daylightposted by Brandon Scales on Sep 3, 2013, 4:00 pm
I am currently working on a school project using option 2 on the IEQ 8.1 form. Many of the rooms have a VLTxWFR ratio that exceeds 1.8. The rooms do not have automated shades (they have black out... Last reply: Brandon Scales, Sep 10, 2013, 2:38 pm |