Log in
Forum
Topic

Applicability of LEED interpretations

NC-2009 EAc1: Optimize Energy Performance
posted by Chilufya Lombe on Jun 19, 2012, 9:11 am

Hi, we have been using the "Advanced Energy Modelling For LEED" document and have a question one some of the exceptional calculation methodology examples. The interiro lighting controls (D.4 in...

Last reply: Marcus Sheffer, Jun 20, 2012, 10:48 am

Water meters to show compliance?

EBOM-2009 WEc2: Additional Indoor Plumbing Fixture and Fitting Efficiency
posted by Iris Amdur on Jun 19, 2012, 9:41 am

In the earlier versions of this ratings system, you could show metered water usage, to prove reduction over the baseline. Is this no longer true? It seems like they only want the design case (aka...

Last reply: Alexa Stone, Jul 18, 2012, 3:45 pm

CS EA Credit 1: Area Used for Baseline HVAC System Types

CS-2009 EAc1: Optimize Energy Performance
posted by Julia Haiduk on Jun 22, 2012, 1:55 pm

Core & Shell Appendix 2 requires that the baseline core and shell HVAC system be modeled per ASHRAE 90.1-2007 Table G3.1.1A. Appendix 2 also dictates the values used for power and lighting in...

Last reply: Marcus Sheffer, Jan 9, 2013, 2:35 pm

Pursuing additional credits after final certification review

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by jim bell on Jun 25, 2012, 11:07 am

We have a project that has received final design and construction review. The project has fallen short of the threshold for Silver. What is the method to pursue additional credits? Do we have...

Last reply: TODD REED, Jun 26, 2012, 11:57 am

European Project with LEED v4 strategy

NC-2009 MRc2: Construction Waste Management
posted by Jaida Anderson-Lozano on Jun 26, 2012, 7:58 am

We have a project in Europe and like many other projects in Europe we are incinerating majority of our construction waste for energy...

Last reply: RETIRED, Apr 4, 2013, 10:26 am

Using the LEED User "LEED Materials Calculator" for uploading

NC-2009 MRc4: Recycled Content
posted by Nelina Loiselle on Jun 27, 2012, 11:51 am

Has anyone acutally used LEED User "LEED Materials Calculator" for uploading to leedonline for MR credits 4-7 in lieu of transferring the data to the BDC Material Rescourse Calculator?

Last reply: Julie Blue, Nov 28, 2012, 10:52 am

native/adapted mix

NC-2009 SSc5.1: Site development - protect or restore habitat
posted by Iris Amdur on Jul 5, 2012, 6:35 pm

To qualify for this credit, does the planted area have to be 100% native/adapted, or can it be a mix?

Last reply: Karin Miller, Jan 3, 2013, 11:13 am

Tristan is awesome.

General forums
posted by Susan Walter on Jul 9, 2012, 11:31 am

I'll play along. But while this is just the two of us, I'm going to underbid you. My guess is 23,975.

Last reply: Lisa Sawin, Jul 13, 2012, 12:42 pm

Building system types vs square footage and non-predominant uses

NC-2009 EAp2: Minimum Energy Performance
posted by Richard Mathews on Jul 11, 2012, 5:31 pm

I'm working on a project that totals approximately 178,000 sf, of which approximately 140,000 sf is office space (3 stories tall), with the other 38,000 sf being conditioned manufacturing space....

Last reply: Marcus Sheffer, Nov 20, 2018, 1:35 pm

IDc2

CS-2009 IDc2: LEED Accredited Professional
posted by Jens Glöggler on Jul 18, 2012, 4:33 am

Is it possible to achieve one more point in the IDc2, if the LEED Accredited Professional is also a...

Last reply: sofia la cognata, Nov 10, 2020, 6:14 am