Forum quick links
Split Submissions now and after 2015
posted by John Neville on
This may be an odd question: Does anyone know what might happen if our project, NC 2.2 registered before 2009, submits for design review this year, then submits for construction review after the 20
Survey for a religious association
EBOM-2009 SSc4:Alternative Commuting Transportationposted by Ralf Lehmann on
My customer is a religious association, that want's to certify their own building. The building is only used on Saturday by the members of the assotiation.
"relevant criteria"
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Marco Abdallah on
The project can comply with the requirements of the credit if the project team can show that the relevant criteria have been met for all HVAC systems serving the area within the project scope, whet
Retention tank
CS-2009 SSc6.1:Stormwater Design—Quantity Controlposted by Anna Korinkova on
Hi all, We are working on a project in Prague with imperviousness >50% (Case 2).
Open Sales Area - qualifications
CS-2009 EAp2:Minimum Energy Performanceposted by charles bell on
We are on our final review for EAp2 and have changed site area from plaza designation to an "outside sales area." The owner proposes to have concerts, arts festivals,etc.
which one that we should select?
posted by Taygun Yüksel on
Hi, I'm working on a consultancy office in Turkey. And we have a a hospital project that it will be only constructed from the firm then sell it to tenant later.
Reset temperature??
CS-2009 EAp2:Minimum Energy Performanceposted by charles bell on
We are on our final review. LEED reviewers have stated that the Baseline Case system input reports indicates that supply air temperature reset was not modeled as required by Section G3.1.3.12.
Mechanical and Naturally ventilated together?
NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfortposted by Saju Varghese on
We have a project for which we have 3 offices, these have been provided with a shared thermostat that controls a constant volume AC Unit also serving a few other areas.
Occupant service capabilities
EBOM-2009 EAc2.1:Existing Building Commissioning—Investigation and Analysisposted by Magda Aghababyan on
Hi, Reviewer comment asks us to provide "The effect on occupant service capabilities" of the capital measures identified during the level II audit.
IEQ p.1
NC-2009 IEQp1:Minimum IAQ Performanceposted by Elvira Samudinova on
Hi everyone! We have an apartment building with the valve air infiltration in studio, and also we have a mechanical bathroom and kitchen exhaust. Can anyone please, clarify, how do we need to class