posted by  John Neville  on 

This may be an odd question: Does anyone know what might happen if our project, NC 2.2 registered before 2009, submits for design review this year, then submits for construction review after the 20

5
LEED AP BD+C, O+M, Green Globes Professional
JLL
LEEDuser Basic Member
112 thumbs up
Thu Jan 23, 2014, 6:32 pm

Survey for a religious association

EBOM-2009 SSc4:Alternative Commuting Transportation
posted by  Ralf Lehmann  on 

My customer is a religious association, that want's to certify their own building. The building is only used on Saturday by the members of the assotiation.

2
Thu Jan 23, 2014, 4:57 pm

"relevant criteria"

CI-2009 EAc1.3:Optimize Energy Performance—HVAC
posted by  Marco Abdallah  on 

The project can comply with the requirements of the credit if the project team can show that the relevant criteria have been met for all HVAC systems serving the area within the project scope, whet

5
Thu Jan 23, 2014, 3:39 pm

Retention tank

CS-2009 SSc6.1:Stormwater Design—Quantity Control
posted by  Anna Korinkova  on 

Hi all, We are working on a project in Prague with imperviousness >50% (Case 2).

2
Principal
Emerald Built Environments
LEEDuser Basic Member
900 thumbs up
Thu Jan 23, 2014, 9:57 am

Open Sales Area - qualifications

CS-2009 EAp2:Minimum Energy Performance
posted by  charles bell  on 

We are on our final review for EAp2 and have changed site area from plaza designation to an "outside sales area." The owner proposes to have concerts, arts festivals,etc.

3
Default Avatar
principal
theGreenTeam, Inc.
LEEDuser Basic Member
10 thumbs up
Wed Jan 22, 2014, 8:27 pm

which one that we should select?

LEED Rating System Selection
posted by  Taygun Yüksel  on 

Hi, I'm working on a consultancy office in Turkey. And we have a a hospital project that it will be only constructed from the firm then sell it to tenant later.

3
Default Avatar
CONSULTANT
SUSTAINABLE BUILDINGS AND OPERATIONS ENVIRONMENTAL CONSULTING
LEEDuser Basic Member
1 thumbs up
Wed Jan 22, 2014, 6:58 pm

Reset temperature??

CS-2009 EAp2:Minimum Energy Performance
posted by  charles bell  on 

We are on our final review. LEED reviewers have stated that the Baseline Case system input reports indicates that supply air temperature reset was not modeled as required by Section G3.1.3.12.

3
Default Avatar
principal
theGreenTeam, Inc.
LEEDuser Basic Member
10 thumbs up
Wed Jan 22, 2014, 5:19 pm

Mechanical and Naturally ventilated together?

NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfort
posted by  Saju Varghese  on 

We have a project for which we have 3 offices, these have been provided with a shared thermostat that controls a constant volume AC Unit also serving a few other areas.

3
Wed Jan 22, 2014, 3:57 pm

Occupant service capabilities

EBOM-2009 EAc2.1:Existing Building Commissioning—Investigation and Analysis
posted by  Magda Aghababyan  on 

Hi, Reviewer comment asks us to provide "The effect on occupant service capabilities" of the capital measures identified during the level II audit.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Wed Jan 22, 2014, 2:05 pm

IEQ p.1

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Elvira Samudinova  on 

Hi everyone! We have an apartment building with the valve air infiltration in studio, and also we have a mechanical bathroom and kitchen exhaust. Can anyone please, clarify, how do we need to class

5
Wed Jan 22, 2014, 1:31 pm