Log in
Forum
Topic

Purchasing Calculator updated 4/8/2016

EBOM-v4 MRc1: Purchasing - ongoing
posted by Trista Brown on Apr 14, 2016, 12:45 pm

USGBC released a revised Purchasing Calculator with an updated weighted average formula for lamps. The link to the calculator in the Resources tab will take you to the updated version.

Purchasing Calculator updated 4/8/2016

EBOM-v4 MRc2: Purchasing - lamps
posted by Trista Brown on Apr 14, 2016, 12:48 pm

USGBC released a revised Purchasing Calculator with an updated weighted average formula for lamps. The link to the calculator in the Resources tab will take you to the updated version.

LEED Project Baundary

Healthcare-v2009 MPR3: Must use a reasonable site boundary
posted by Paula Hernandez on Apr 15, 2016, 12:02 pm

Hi,
We have a 16 story building which is going under major renovation.
The new Owner wants to get the building certified as C&s.
The issue is that the ground floor will be...

LEED user Assembly Calculator for Certified Wood

NC-2009 MRc7: Certified Wood
posted by Esther Kohout on Apr 15, 2016, 3:45 pm

Still confused on...

Automatic metered urinals

CS-2009 WEp1: Water Use Reduction
posted by Ward Miller on Apr 18, 2016, 11:54 am

Metered showers and faucets appear to be rather clear based on the available LEED information and the new Water Use Reduction Calculator, but metered urinals appear to be overlooked.
Does...

EAC4 Enhanced Refrigerant Management

NC-2009 EAc4: Enhanced Refrigerant Management
posted by Sahar Al-Khairi on Apr 20, 2016, 7:55 am

In a project I'm working on , we are using two heat pumps for cooling and heating,such that only one heat pump is going to be used during the summer season(cooling) and both pumps are to be used...

LEED for Homes Training in Europe

LEED for Homes (LEED-H) Forum
posted by Emmanuel Pauwels on Apr 20, 2016, 10:21 am

We are planning on organizing Green Rater and HERS training in Europe later this year. If anyone is interested, go not hesitate to get in touch with me. We hope this will allow for more LEED for...

Controlled Entry

Pilot-Credits EQpc78: Design for active occupants
posted by Jon Hall on Apr 20, 2016, 12:38 pm

Option 4 of the design features states:

Locate a main staircase to be visible from main building lobby and within 25 foot (7.5 meters)...

Label Requirements Clarification

Pilot-Credits IPpc90: Social equity within the operations and maintenance staff
posted by Jon Hall on Apr 20, 2016, 12:47 pm

While documenting this credit, we noticed that there is some uncertainty regarding the current status of the JUST Label. Our assumption is that to meet this credit, the JUST Label must be...

CCHP System modeling

NC-2009 EAp2: Minimum Energy Performance
posted by Jie Shen on Apr 20, 2016, 10:07 pm

My project is provided by CCHP system which owned by third party, the CCHP has two gas generators, one heat recovered gas absorption chiller, two normal chillers and two boilers.
1)chilled...