LEED NC for new office buidingGeneral forumsposted by Fabio Frescia on Jul 7, 2015, 12:55 am
Dear all, |
|
How FINAL is the Appeal?General forumsposted by Mary Kay on Jul 8, 2015, 9:19 am
EAp2 was denied in our final design review. We are going to appeal this by addressing their comments and getting the energy savings above 10%. My question is, IF the appeal is denied, what then... |
|
Conveying systems now accepted for this creditNC-v4 MRc2: Building product disclosure and optimization - environmental product declarationsposted by Paula Melton on Jul 9, 2015, 7:27 pm
A recent Interpretation states that fire-suppressing equipment and conveying systems now... |
|
Conveying systems now accepted for this creditNC-v4 MRc3: Building product disclosure and optimization - sourcing of raw materialsposted by Paula Melton on Jul 9, 2015, 7:29 pm
A recent Interpretation states that fire-suppressing equipment and conveying systems now... |
|
Conveying systems now accepted for this creditNC-v4 MRc4: Building product disclosure and optimization - material ingredientsposted by Paula Melton on Jul 9, 2015, 7:29 pm
A recent Interpretation states that fire-suppressing equipment and conveying systems now... |
|
Case 2CI-2009 SSc3.3: Alternative transportation - parking availabilityposted by Mike D on Jul 10, 2015, 6:33 am
The project has 2500... |
|
What is the consulting cost for 5 year EBOM recertification?General forumsposted by Corey Lee Wilson on Jul 12, 2015, 1:36 pm
Thanks Tristan for being a valuable resource on this matter. As a LEED AP O+M, my consulting practice is offering LEED... |
|
Recirculating airflow, table 6.4 and cold roomsNC-2009 IEQp1: Minimum indoor air quality performanceposted by Daniel Rimbault on Jul 17, 2015, 5:28 am
Good morning everyone. I have three quick questions I am hoping someone can help me with; Many of my zones have fresh air supplied by a central... |
|
Where is the center of the ½-mile radius?NC-2009 SSc2: Development Density and Community Connectivityposted by Jon Clifford on Jul 18, 2015, 1:14 am
Under the “Bird’s Eye View” tab above, in response to the FAQ, “Where do I draw the radius from?” it says, “Use the center of the LEED project boundary.” This same advice is in the LEEDuser “... |
|
Example of a populated BPDO calculator with all tabsNC-v4 MRc3: Building product disclosure and optimization - sourcing of raw materialsposted by Jaspreet Pahwa on Jul 19, 2015, 11:07 am
Project Location: United States Trying to determine for EPD tab within BPDO calculator, if the bottom-line of Weighted EPD value needs to be 20 or as long as 20 products from 5... |