Log in
Forum
Topic

Performance Equivalency of CIBSE TM23:2000 for ANSI/ASTM-E779-03

NC-2009 IEQp2: Environmental Tobacco Smoke (ETS) Control
posted by Jutta Berns on May 15, 2012, 7:51 am

does anybody have any experience using CIBSE TM23:2000 to test for building air tightness and documenting this under the Alternative Compliance Path for performance equivalency (ANSI/...

Mixed Use Residential Baseline 90.1-2004

NC-2009 EAc1: Optimize Energy Performance
posted by Ruben Porter on May 17, 2012, 3:04 pm

*Moved to NCv2.2 Credit EAp2

Comnet automated template completion

NC-2009 EAp2: Minimum Energy Performance
posted by Erin Adkins on Jun 1, 2012, 10:33 am

Has anybody here used the Comnet.org portal to automatically complete your EAp2 and EAc1 templates using the Comnet XML export from your Trace 700 model or Equest sim files? Did it work well for...

elastomeric coating

NC-2009 IEQc4.1: Low-emitting materials - adhesives and sealants
posted by Emmanuel Pauwels on Jun 3, 2012, 1:17 pm

We are using an elastomeric coating that funtions as an adhesive for a plastic cover of a tube as well as an anti-humidity barrier. To which category would such an elastomeric coating belong?...

Inert post-installation materials

NC-2009 IEQc4.2: Low-emitting materials - paints and coatings
posted by Andrew Gil on Jun 5, 2012, 3:16 pm

I am remembering hearing of an addendum, errata or...

ID Credit- Building as a Teaching Tool

NC-2009 IDc1: Innovation in Design
posted by Jody Boelhauf on Jun 15, 2012, 3:14 pm

I am working on a building for a University and they are wanting to have a "Digital Dashboard" or a "Vital Sign" for the building. This would serve at least two functions, one to teach/inform...

U-value unheated/heated slab-on-grade floor

NC-2009 EAc1: Optimize Energy Performance
posted by Francesco Passerini on Jul 4, 2012, 9:32 am

Hello.
In the building which I’m modeling there is an underground floor whose slab-on-grade floor can be considered as divided in three parts: one part (wellness) is heated with heated...

Hotel

NC-2009 EAp1: Fundamental Commissioning of Building Energy Systems
posted by Nelina Loiselle on Jul 7, 2012, 5:19 pm

To satisfy the LEED requirements, does every room in a hotel have to be commissioned?

Option 1- Football Stadium and Bullfighting Ring

NC-2009 SSc2: Development Density and Community Connectivity
posted by Alicia Villanueva on Jul 9, 2012, 11:48 am

We are trying to achieve this credit through option 1 documenting the buildings located within the 1/2 mile radius. Should we include a football stadium and a bullfighting ring?
If so, what...

LED Job-site lighting earns ID point

NC-2009 IDc1: Innovation in Design
posted by Nadav Malin on Jul 25, 2012, 3:00 pm