Flushing toilets with drilled corrosive non potable waterNC-2009 WEc3: Water Use Reductionposted by Viktor Reutherborg on Sep 2, 2014, 3:06 am
We have an adjacent property (with the same owner) that has to remove non potable water from its foundation. This groundwater flows in a large part from our property. We would like to drill and... |
|
Engineered ventilation ratesNC-2009 IEQp1: Minimum indoor air quality performanceposted by LEEDme Lorenzi on Sep 2, 2014, 5:43 am
We are working on a office building in which there is an openspace. The outside openings largely cover 4% of the total floor area. A small part of the open space area falls outside the distance... |
|
Regarding LEED Project BoundaryEBOM-2009 MPR3: Must use a reasonable site boundaryposted by Shelendra Kumar on Sep 3, 2014, 4:00 am
Hello Team, One of our project which is already LEED NC certified and now wants to go for EB certification, our concern is about its project boundary. |
|
Opt 2 metered water use and building level water meteringEBOM-v4 WEp1: Indoor water use reductionposted by OSCAR DE LA RED on Sep 3, 2014, 3:07 pm
Can the water meter installed to measure the monthly and total building level water (WEPR2) be used to determine the anual Option 2 metered water use baseline (WEPR1 option2) if there is no... |
|
Calculating FTE for a DormCalculating FTEsposted by Nelina Loiselle on Sep 8, 2014, 10:23 am
Hello, I was wondering if someone can help me with calculating the... |
|
When land not owned by theCS-2009 MPR3: Must use a reasonable site boundaryposted by gabriel Morales on Sep 9, 2014, 3:39 pm
When land not owned by the LEED project owner may be included Land that the LEED project owner does not own (i.e., leases, has an... |
|
Exlude retail zoneCS-2009 MPR3: Must use a reasonable site boundaryposted by gabriel Morales on Sep 9, 2014, 3:41 pm
Hello, in the reference guide mention the following: When land not owned by the LEED project owner may be included Land that the LEED project owner does not own (i.e., leases, has an... |
|
TimelineCI-2009 PIf1: Minimum Program Requirementsposted by R G on Sep 10, 2014, 3:19 pm
We have recently received substantial completion for construction for one of our projects. The project was registered for design part during inception of the design but is not yet submitted for... |
|
retail spaces in office buildingCS-2009 IEQc2: Increased Ventilationposted by Anna Bak on Sep 14, 2014, 10:31 am
Hi, |
|
Data Center CalculatorNC-v4 EAp2: Minimum Energy Performanceposted by Vassil Vassilev on Sep 15, 2014, 6:21 am
For Data center project, I've supplied the designer team with the Data Center Calculator, so that they'd be able to fill it in with their project data. |