Topic | Recent |
---|---|
Locker/Dressing Rooms Exhaust into Parking Garage spacesCS-2009 IEQp1: Minimum indoor air quality performanceposted by Adriana Hansen on Jun 18, 2014, 11:36 am
I would like to know if is acceptable to design the exhaust outlet of locker/dressing rooms directly to a parking Garage space. We have an basement level with dressing rooms adjacent to a... |
|
"Project boundaries that include other buildings"Healthcare-v2009 MPR3: Must use a reasonable site boundaryposted by Renaud Gay on Jun 18, 2014, 11:49 pm
Hello, MPR3 describe situation for "Project boundaries that include other buildings". If I understand correctly this is a choice of the project team to include or not those other... |
|
Using a variety of waste recycling resources may be necessaryPilot-Credits MRpc69: Construction and demolition waste managementposted by Joanna Switzer on Jun 19, 2014, 5:10 pm
Just completed a renovation of an older Armory... |
|
Final review appeal for credit EAc1, new energy modelGeneral forumsposted by Veronica Reed on Jun 19, 2014, 11:03 pm
Hello We just received the final review report and despite being awarded 31 credits in all categories besides Energy and Atmosphere, we were denied certification since our energy modeling... |
|
Timeline for periodic LEED version updateGeneral forumsposted by Lily Livingston on Jun 23, 2014, 6:52 pm
I looked online and tried to find a graphic or info I know I have seen once that shows the typical timeline for a "next" version of LEED, the version update cycle timeline. Does anyone know where... |
|
Louvered Parking CoverNC-2009 SSc7.1: Heat island effect - nonroofposted by Jonathan Weiss on Jun 24, 2014, 10:59 am
I've been working on this type of strategy for a long time but our design team asked me a question I could not answer: For a project in a hot, arid climate we are designing parking... |
|
Recilculation Class AirCS-2009 IEQp1: Minimum indoor air quality performanceposted by Luis Miguel Diazgranados on Jun 24, 2014, 2:21 pm
Hi everybody, I am working in an office building project, core and Shell scope. It has 2 spaces, one whit natural ventilation class 1 (Lobby) and other class 2 (Parking garage) with no... |
|
Alternative-fuel fueling stations for everyone?NC-2009 SSc4.3: Alternative transportation - low-emitting and fuel-efficient vehiclesposted by Jan Hesse on Jun 26, 2014, 3:10 am
We are working on a project with 350 parking spaces and several tenants. |
|
feedback commentPilot-Credits WEpc10: Sustainable wastewater managementposted by Mónika Egyed on Jun 26, 2014, 5:21 am
In our project, the pilot credit was achievable by 50% reduction from WC and urinal water use. |
|
Factory Space Default valueCS-2009 IEQp1: Minimum indoor air quality performanceposted by John Covello on Jun 27, 2014, 4:38 am
Hello, We have a client who is designing a C&S factory. They are not sure who the tenant will be other than a factory space. They have no planned mechanical ventilation to install for... |