Log in
Forum
Topic

Storage and collection of recyclables- Size

NC-v4 MRp1: Storage and Collection of Recyclables
posted by Cora Kenrick on Jul 9, 2018, 12:54 pm

on their assumed volume and pick-up frequency.  I'm curious if anyone else in the forum has tips/suggestions? Log in or register to post comments Cora Kenrick Energy Engineering Specialist LEEDuser Basic Member...

Last reply: Cora Kenrick, Jul 10, 2018, 1:07 pm

use of waste heat from iIndustrial process for the office heating

NC-v4 EAc5: Renewable energy production
posted by Qian Tang on Jul 10, 2018, 6:22 am

them in the EAp2 forum since this is not a question regarding renewable energy. The question is how to account for the cost issue. If the proposed heating fuel cost is free then what is the baseline fuel...

Last reply: Marcus Sheffer, Aug 10, 2018, 12:35 pm

Building Addition Energy Metering

NC-v4 EAp3: Building-level energy metering
posted by Mark Zoeteman on Jul 10, 2018, 4:15 pm

Proposed LEED project involves only a building addition in a campus setting where portion is served by new mechanical equipment and portion by existing building mechanical equipment. Dedicated...

Last reply: Cindy Quinn, May 19, 2020, 2:58 pm

Outside Airflow Monitoring Device

NC-v4 EQp1: Minimum indoor air quality performance
posted by Jennifer Rennick on Jul 10, 2018, 6:45 pm

The mechanical engineering team on the LEED project I am working on has proposed to install current monitoring switches at each unit supply fan power feed.

Is this an acceptable...

Last reply: Rebecca Rice, Dec 6, 2021, 12:23 pm

Can client provide testing of a product to show compliance?

NC-v4 EQc2: Low-emitting materials
posted by emily reese moody on Jul 11, 2018, 8:18 pm

My client is a university that asked if they could provide the testing required for products if it's not available from the manufacturers. They are an engineering school, and likely have the...

Last reply: emily reese moody, Jul 19, 2018, 5:27 pm

CS-v4 IPc1- Integrative Process (Design Charrette)

NC-v4 IPc1: Integrative process
posted by Estra Marku on Jul 12, 2018, 4:07 pm

trying to familiarize ourselves with LEED v4 at the time that I posted this forum. Thank you Tristan and Summer for clearing things up, I really appreciate your help. Log in or register to post comments ...

Last reply: Estra Marku, Oct 16, 2018, 6:15 pm

Reviewer Writes: Daily average FTE values should be higher than Peak FTE values

NC-2009 PIf3: Occupant and Usage Data
posted by Diego Prada on Jul 25, 2018, 5:25 pm

Greetings everyone,

We received a review for a Healthcare project. In it the review team is asking why "the Staff...

Last reply: David Eldridge, Aug 10, 2018, 3:51 pm

Shared Parking Spaces and Existing EV Charging Stations on University Campus

NC-v4 LTc8: Green vehicles
posted by Ashley Hu on Jul 27, 2018, 3:05 pm

Hi everyone,

We have a student housing project that is located within a university campus which has shared parking with the rest of the campus. There are some existing EV charging stations...

Last reply: Jasmin Rajak, May 23, 2020, 5:06 am

Green Infrastructure Stormwater Reuse

NC-v4 SSc4: Rainwater management
posted by Patrick Murphy on Jul 31, 2018, 6:14 pm

and reuse for process mechanical and plumbing has been repeatedly denied. There are a bunch of examples in this forum.  Log in or register to post comments Maria Porter Sustainability specialist Skanska...

Last reply: Maria Porter, Feb 5, 2020, 4:56 am

Including envelope in OPR and BOD when envelope is not part of the CI scope

CI-v4 EAp1: Fundamental commissioning and verification
posted by Elizabeth Powers on Aug 7, 2018, 5:25 pm

Hi folks,

I am trying to clarify how to meet the requirements to include envelope criteria in the...

Last reply: Scott Bowman, Apr 26, 2021, 11:40 am