Storage and collection of recyclables- SizeNC-v4 MRp1: Storage and Collection of Recyclablesposted by Cora Kenrick on Jul 9, 2018, 12:54 pmon their assumed volume and pick-up frequency. I'm curious if anyone else in the forum has tips/suggestions? Log in or register to post comments Cora Kenrick Energy Engineering Specialist LEEDuser Basic Member... Last reply: Cora Kenrick, Jul 10, 2018, 1:07 pm |
|
use of waste heat from iIndustrial process for the office heatingNC-v4 EAc5: Renewable energy productionposted by Qian Tang on Jul 10, 2018, 6:22 amthem in the EAp2 forum since this is not a question regarding renewable energy. The question is how to account for the cost issue. If the proposed heating fuel cost is free then what is the baseline fuel... Last reply: Marcus Sheffer, Aug 10, 2018, 12:35 pm |
|
Building Addition Energy MeteringNC-v4 EAp3: Building-level energy meteringposted by Mark Zoeteman on Jul 10, 2018, 4:15 pm
Proposed LEED project involves only a building addition in a campus setting where portion is served by new mechanical equipment and portion by existing building mechanical equipment. Dedicated... Last reply: Cindy Quinn, May 19, 2020, 2:58 pm |
|
Outside Airflow Monitoring DeviceNC-v4 EQp1: Minimum indoor air quality performanceposted by Jennifer Rennick on Jul 10, 2018, 6:45 pm
The mechanical engineering team on the LEED project I am working on has proposed to install current monitoring switches at each unit supply fan power feed. Is this an acceptable... Last reply: Rebecca Rice, Dec 6, 2021, 12:23 pm |
|
Can client provide testing of a product to show compliance?NC-v4 EQc2: Low-emitting materialsposted by emily reese moody on Jul 11, 2018, 8:18 pm
My client is a university that asked if they could provide the testing required for products if it's not available from the manufacturers. They are an engineering school, and likely have the... Last reply: emily reese moody, Jul 19, 2018, 5:27 pm |
|
CS-v4 IPc1- Integrative Process (Design Charrette)NC-v4 IPc1: Integrative processposted by Estra Marku on Jul 12, 2018, 4:07 pmtrying to familiarize ourselves with LEED v4 at the time that I posted this forum. Thank you Tristan and Summer for clearing things up, I really appreciate your help. Log in or register to post comments ... Last reply: Estra Marku, Oct 16, 2018, 6:15 pm |
|
Reviewer Writes: Daily average FTE values should be higher than Peak FTE valuesNC-2009 PIf3: Occupant and Usage Dataposted by Diego Prada on Jul 25, 2018, 5:25 pm
Greetings everyone, We received a review for a Healthcare project. In it the review team is asking why "the Staff... Last reply: David Eldridge, Aug 10, 2018, 3:51 pm |
|
Shared Parking Spaces and Existing EV Charging Stations on University CampusNC-v4 LTc8: Green vehiclesposted by Ashley Hu on Jul 27, 2018, 3:05 pm
Hi everyone, We have a student housing project that is located within a university campus which has shared parking with the rest of the campus. There are some existing EV charging stations... Last reply: Jasmin Rajak, May 23, 2020, 5:06 am |
|
Green Infrastructure Stormwater ReuseNC-v4 SSc4: Rainwater managementposted by Patrick Murphy on Jul 31, 2018, 6:14 pmand reuse for process mechanical and plumbing has been repeatedly denied. There are a bunch of examples in this forum. Log in or register to post comments Maria Porter Sustainability specialist Skanska... Last reply: Maria Porter, Feb 5, 2020, 4:56 am |
|
Including envelope in OPR and BOD when envelope is not part of the CI scopeCI-v4 EAp1: Fundamental commissioning and verificationposted by Elizabeth Powers on Aug 7, 2018, 5:25 pm
Hi folks, I am trying to clarify how to meet the requirements to include envelope criteria in the... Last reply: Scott Bowman, Apr 26, 2021, 11:40 am |