Topic | Recent |
---|---|
MRc7 DocumentationNC-2009 MRc7: Certified Woodposted by Maura Adams on Jun 8, 2011, 1:13 pm
I am confused about documentation requirements. The template states that vendor invoices are required on a line item basis... but if they're line items, they're not the original invoices. I can't... Last reply: Jennifer Frey, Jun 8, 2011, 3:45 pm |
|
Recycled Content & FSC Certified Wood Credits Grey AreaNC-2009 MRc7: Certified Woodposted by Roberto Meza on Jul 29, 2011, 5:47 pm
We have the following case: We bought several door with the following characteristics according to the cut sheet:... Last reply: Lauren Sparandara, Apr 18, 2013, 1:42 pm |
|
Feedback on the LEED 2009 ACPs for Projects Outside the U.S.General forumsposted by Deon Glaser on Nov 15, 2011, 2:30 pm
Hello everyone, After working at USGBC for the past 5 1/2 years, I have recently transitioned into a role overseeing the LEED 2009 ACPs for Projects Outside the U.S. and am happy to see... Last reply: Eric Johnson, Apr 10, 2015, 1:41 pm |
|
IEQp1- Occupant diversityNC-2009 IEQp1: Minimum indoor air quality performanceposted by susan eguia on Apr 27, 2012, 2:14 pm
Hi, We have existing Library project with combined multiple zone and single zone. We used the V4.0 form as per requirement during initial review, however, our IEQp1 has been denied with... Last reply: Manny Iglesia, May 7, 2012, 6:04 pm |
|
electrical room/swimming pools coolingNC-2009 EAp2: Minimum Energy Performanceposted by Tarek Dalati on Jun 4, 2012, 2:15 am
is the electrical rooms and internal swimming pools cooling is considered as a process load or not? regards Last reply: Erin Adkins, Jun 4, 2012, 10:51 am |
|
Excluding Soil Brought in from Off-siteNC-2009 MRc4: Recycled Contentposted by Margaret McColl on Oct 12, 2012, 11:36 am
Hello, I'm working on a project where a very large amount of the soil had to be removed due to contamination (we are pursuing SSc3) and clean soil had to be brought in from off-site. The... Last reply: Tim Crowley, Nov 27, 2012, 8:34 am |
|
System fan power- BaselineNC-2009 EAp2: Minimum Energy Performanceposted by Luana Bertoletti on Oct 16, 2012, 10:41 am
Hi, I have a doubt related to the system fan power calculation described in section G.1.2.9. Last reply: Marcus Sheffer, Feb 11, 2013, 10:34 am |
|
LEED Interpretation: get recycled content figures by plantNC-2009 MRc4: Recycled Contentposted by Tristan Roberts on Oct 31, 2012, 10:06 am
LEED Interpretation #10246, out on 10/1/12, makes a pretty big change to documentation requirements for MRc4 (effective for... Last reply: Tristan Roberts, Jan 30, 2013, 12:02 pm |
|
ISO 140001 CertificationNC-2009 IDc1: Innovation in Designposted by kathy zarsky on Nov 27, 2012, 6:45 pm
Has anyone had any success in receiving an innovation credit point for this with LEED version 2009? Last reply: Anna Foden, Dec 18, 2020, 12:28 pm |
|
CxA contracting for enhanced commissioning in a design&build proNC-2009 EAc3: Enhanced Commissioningposted by Valentin Grimaud on Nov 29, 2012, 7:38 pm
Dear All, We have a 300,000sqft project, quite technical facility. It is a design&build contract and the owner is reluctant on taking independent contracts on his own. In... Last reply: Scott Bowman, Jul 18, 2013, 12:38 pm |