Log in
Forum
Topic

Cooling tower cycles

NC-v4 WEc3: Cooling tower water use
posted by Manuel Martin Delgado on Mar 30, 2016, 7:30 am

Hi,

I am a bit confused with the credit requirements for achieving 1 point.
We have already the make-up water parameters and we have calculated the cycles of concentration for each...

Last reply: Nathan Gauthier, Aug 13, 2021, 11:02 am

Streams

NC-v4 MRc5: Construction and demolition waste management
posted by Charalampos Giannikopoulos on Jul 14, 2015, 6:08 am

In PR prerequisite it is required that 5 materials have been identified for diversion. If for the credit only 4 steams have been used would this discrepancy cause a problem towards compliance...

land clearing debris, soil, etc

NC-v4 MRc5: Construction and demolition waste management
posted by Jen Roberts on Nov 7, 2015, 3:21 pm

On page 591 of the ref guide, it states...

Last reply: RETIRED, Apr 7, 2016, 10:47 am

Project specific diversion vs facility average diversion

NC-v4 MRc5: Construction and demolition waste management
posted by Eesmyal Santos-Brault on Jun 2, 2016, 3:02 pm

https://leeduser.buildinggreen.com/forum/alternative-calculation-mrc2 for more detail on the topic of visual inspection. In addition, there has been a rather spirited discussion regarding commingled waste but that seems to be lost as well. Please know that reviewers...

Last reply: RETIRED, Oct 5, 2017, 1:08 pm

No exterior lights?

NC-v4 SSc6: Light Pollution Reduction
posted by Jon Penndorf on Aug 27, 2015, 9:50 am

We are looking at a project that would be considered a major renovation, but we are not touching the outside face of the exterior walls of the building. As such we are making no modifications to...

Last reply: Elizabeth (Zeba) Floyd, Apr 26, 2018, 2:39 pm

WELL Continuing Education

WELL v1 Building Standard Tip Sheet
posted by Pippa Lee on Mar 13, 2017, 12:29 pm

Hi all,

I had a question regarding WELL CE credits, and more specifically the 6 WELL specific units you must achieve for ongoing AP certification. Given I am not working in an office that...

Last reply: Lida Lewis, Aug 3, 2017, 12:04 pm

Owns Building

CI-2009 EAc3: Measurement and Verification
posted by Kristopher Croghan on Mar 17, 2017, 4:01 pm

If a client owns all of the interior space, then I assume that they would obtain this credit, since they pay all of their energy and water bills. Would I be correct?

Last reply: Marcus Sheffer, Jul 5, 2017, 12:57 pm

Not eligible if no non-potable water?

CI-v4 IPc1: Integrative process
posted by emily reese moody on Mar 21, 2017, 5:07 pm

It appears that a project may not be eligible for the 1 point associated with the Water Related System if their building(s) do not offer non-potable water sources. Is this correct? Regardless of...

Last reply: emily reese moody, May 15, 2018, 10:01 pm

Manufacturers' claims and laboratory requirements.

NC-v4 EQc2: Low-emitting materials
posted by Ashley Hu on Mar 27, 2017, 9:08 pm

Hi there,

the credit requires:

Both first-party and third-party statements of product compliance must follow the guidelines in CDPH SM V1.1 -2010, Section 8. Organizations that...

Last reply: Reinhard Oppl, Mar 30, 2017, 6:41 am

20% product sheets still required?

CI-2009 IEQc4.3: Low-emitting materials - flooring systems
posted by Maria Papiez on Mar 28, 2017, 11:50 am

Hello. I do not see reference in the current version of LEED Online credit forms to upload 20% of product cutsheets. This general guidance is included in several credit descriptions here on...

Last reply: Maria Papiez, Mar 29, 2017, 10:58 am