Log in
Forum
Topic

Question about terrace without roof

CI-2009 IEQc8.1: Daylight and views - daylight
posted by Haoyang Li on Apr 6, 2016, 11:32 pm

Hi all,
I am working on a commercial interior university restaurant project. There is a non-roof terrace at 3rd floor. This terrace is located at the west side of the main building which...

Last reply: Haoyang Li, Apr 7, 2016, 1:29 pm

SR Values for Paving

NC-v4 SSc5: Heat Island Reduction
posted by Francis McNulty on Apr 12, 2016, 7:34 am

Hi,

Under LEED V4, if the manufacturer can not provide the SR value for paving can we use standard SR values based on the colour of the paving? Or to comply under V4 must we have specific...

Last reply: Zeynep Cakir, Sep 11, 2018, 8:16 am

Mastersite scorecard Construction Review

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by Susannah Goddard on Apr 12, 2016, 9:37 am

My project is a Campus project. All of the credits sought on the Mastersite scorecard are "Awarded" after Final Design Review (and appeal in some cases). What do I do now? Do I still need to...

Last reply: Susannah Goddard, Apr 13, 2016, 10:13 am

commissioning of outbildings

NC-2009 EAp1: Fundamental Commissioning of Building Energy Systems
posted by Jutta Berns on Apr 18, 2016, 5:08 am

we have a campus project where currently only the main building is undergoing certification. There are however some building services housed in the adjacent outbildings, which support the...

Last reply: Scott Bowman, Apr 27, 2016, 2:54 pm

ventilation levels

NC-2009 EAp2: Minimum Energy Performance
posted by Tristan Roberts on Apr 20, 2016, 12:27 pm

I got this question via email and thought I would post it here for your help. Thanks!
Q: If a project is pursuing EQc2 Increased Ventilation, what ventilation levels do they model for EAp2...

Last reply: Dave Hubka, Apr 21, 2016, 3:51 pm

Floor area- allowable difference between sim. model and PIf3

CS-2009 IEQc8.1: Daylight and views - daylight
posted by Anna Korinkova on Apr 27, 2016, 10:49 am

We are pursuing the Option 1 - simulation path. The total regularly occupied area (ROA) reported for the simulation is linked to the PIf3 credit. This represents a challenge when creating the...

Last reply: Anna Korinkova, May 6, 2016, 9:40 am

MR 2.2 Form Change

EBOM-2009 MRc2: Sustainable Purchasing—Durable Goods
posted by Fred Smith on May 3, 2016, 1:13 pm

I am confused as the the new form on LEED On Line vs what you are showing on LEED User. I am not sure what is needed to upload in regards to our purchasing and criteria for sustainability. The...

Last reply: Trista Brown, Feb 22, 2017, 12:10 pm

Shuttle between building and secured site entrances

NC-2009 SSc4.1: Alternative transportation - public transportation access
posted by J Douglas Dietrich on May 4, 2016, 12:30 pm

Distance from LEED building to public transit stops is too far to meet requirements, however distance from the guardhouse gate controlling access to the secured site on which the LEED building is...

Last reply: Priya Venkat, Sep 28, 2018, 6:48 am

MERV 13 filters

NC-2009 IEQc5: Indoor Chemical and Pollutant Source Control
posted by ethen mcmanus on May 15, 2016, 3:33 am

The third bullet of IEQ 5 states the following:

In mechanically ventilated buildings, each ventilation system that supplies outdoor air shall comply with the
following:
–...

Last reply: Rodolfo Loro, Jr., Dec 19, 2019, 10:33 pm

10% exemption

EBOM-2009 IEQp1: Minimum indoor air quality performance
posted by Gustavo De las Heras Izquierdo on May 17, 2016, 6:41 pm

Is it allowed to exclude up to 10% of spaces from this prerequisite?

Our project is a 20-story building that complies with the ventilation rates but there is an office in the core that...

Last reply: Michael Smithing, Jan 16, 2017, 7:27 pm