Topic | Recent |
---|---|
Single tenant in building pursuing Core & ShellCS-2009 EAc5.2: Measurement and verification - tenant submeteringposted by Dave Hubka on Nov 5, 2015, 10:33 am
The building is pursuing C&S certification and has a perspective tenant that may fit out the entire space. We are proposing to charge the perspective tenant the entire electricity bill minus... Last reply: Saud Abdul Rasheed, Nov 5, 2015, 11:44 am |
|
Materials and Resources/ Building Life-Cycle Impact ReductionNC-v4 MRc1: Building life-cycle impact reductionposted by RICHARD ABRAHAMS on Nov 10, 2015, 1:46 pm
Materials and Resources / Building Life-Cycle Impact Reduction / Option 4 / Life-Cycle Assessment Software Tool: What is this tool, and where can I find it, and is the tool accessible on... Last reply: Jennifer O'Connor, Aug 2, 2018, 2:06 am |
|
CI Lighting Compliance Exemption out of scopeCI-2009 EAp2: Minimum Energy Performanceposted by Alexis Voeltner on Nov 18, 2015, 11:49 am
Our CI project does not have lighting included in its scope (very cost prohibitive, for the way lighting is layed out in the space) and... Last reply: Alexis Voeltner, Nov 23, 2015, 11:04 am |
|
Option 1- HPD Residual DisclosureNC-v4 MRc4: Building product disclosure and optimization - material ingredientsposted by Dalton Ho on Nov 19, 2015, 6:24 pm
Option 1 requirements state that for the HPD to be applicable, the “HPD standards for the 1,000-ppm level must be attained and the appropriate box on the summary page checked”. However, after... Last reply: Dalton Ho, Mar 30, 2016, 3:55 pm |
|
62.1 and 90.1-2010NC-v4 EAp2: Minimum Energy Performanceposted by Samuel Gelfand on Nov 23, 2015, 12:22 pm
We are working on a high rise multifamily building where the corridors are supplied with 100% semi-conditioned OA. This OA is used both for ventilation (62.1) and conditioning the space. Since... Last reply: Marcus Sheffer, Nov 25, 2015, 12:14 pm |
|
rust oleum magnetic primerNC-2009 IEQc4.1: Low-emitting materials - adhesives and sealantsposted by Anastasia Makarenko on Nov 26, 2015, 5:59 amthrough this forum you'll see some examples of nonstandard coatings being puzzled through. How will the wall be used? Perhaps it could be called a graphic arts coating. Log in or register to post... Last reply: Anastasia Makarenko, Nov 30, 2015, 8:08 am |
|
Resort Hotel and CondoNC-2009 MPR2: Must be a complete, permanent building or spaceposted by John Zehren on Nov 30, 2015, 6:33 pm
I am working on a 7 story resort hotel and condo under LEED 2009 NC. We just received word that the 9 Condos on floors 6 and 7 will be finished at a future date. Floors 1-5 are under... Last reply: Christopher Schaffner, Dec 17, 2015, 7:01 pm |
|
2 office floors on a 20 stories buildingEBOM-v4 MPR2: Must use reasonable LEED boundariesposted by Michael E. Edmonds-Bauer on Dec 7, 2015, 5:50 pm
Hello, We have a cliente that is interested in pursuing LEED for his brand new offices. They have been operating for the past 6 months and they do not have any documentation about LEED... Last reply: Trista Brown, Jan 5, 2016, 2:23 pm |
|
SRI Value from the Test CertificateNC-2009 SSc7.2: Heat island effect - roofposted by Nandana Kumar on Dec 10, 2015, 4:52 am
Hello, Whenever we receive a... Last reply: Arthika Saseendranath, Jan 12, 2021, 7:05 am |
|
LEED CS building with very minimum landlord provisionCS-2009 EAp2: Minimum Energy Performanceposted by Michael Wahjudi on Dec 10, 2015, 11:27 pm
Hi all, I have LEED CS with very minimum client provision without AC systems (only emergency lights, emergency fans and lifts). But the main tenant has been agreed from the building and the... Last reply: Michael Wahjudi, Dec 15, 2015, 2:07 am |