Log in
Forum
Topic

Single tenant in building pursuing Core & Shell

CS-2009 EAc5.2: Measurement and verification - tenant submetering
posted by Dave Hubka on Nov 5, 2015, 10:33 am

The building is pursuing C&S certification and has a perspective tenant that may fit out the entire space. We are proposing to charge the perspective tenant the entire electricity bill minus...

Last reply: Saud Abdul Rasheed, Nov 5, 2015, 11:44 am

Materials and Resources/ Building Life-Cycle Impact Reduction

NC-v4 MRc1: Building life-cycle impact reduction
posted by RICHARD ABRAHAMS on Nov 10, 2015, 1:46 pm

Materials and Resources / Building Life-Cycle Impact Reduction / Option 4 / Life-Cycle Assessment Software Tool:

What is this tool, and where can I find it, and is the tool accessible on...

Last reply: Jennifer O'Connor, Aug 2, 2018, 2:06 am

CI Lighting Compliance Exemption out of scope

CI-2009 EAp2: Minimum Energy Performance
posted by Alexis Voeltner on Nov 18, 2015, 11:49 am

Our CI project does not have lighting included in its scope (very cost prohibitive, for the way lighting is layed out in the space) and...

Last reply: Alexis Voeltner, Nov 23, 2015, 11:04 am

Option 1- HPD Residual Disclosure

NC-v4 MRc4: Building product disclosure and optimization - material ingredients
posted by Dalton Ho on Nov 19, 2015, 6:24 pm

Option 1 requirements state that for the HPD to be applicable, the “HPD standards for the 1,000-ppm level must be attained and the appropriate box on the summary page checked”. However, after...

Last reply: Dalton Ho, Mar 30, 2016, 3:55 pm

62.1 and 90.1-2010

NC-v4 EAp2: Minimum Energy Performance
posted by Samuel Gelfand on Nov 23, 2015, 12:22 pm

We are working on a high rise multifamily building where the corridors are supplied with 100% semi-conditioned OA. This OA is used both for ventilation (62.1) and conditioning the space. Since...

Last reply: Marcus Sheffer, Nov 25, 2015, 12:14 pm

rust oleum magnetic primer

NC-2009 IEQc4.1: Low-emitting materials - adhesives and sealants
posted by Anastasia Makarenko on Nov 26, 2015, 5:59 am

through this forum you'll see some examples of nonstandard coatings being puzzled through. How will the wall be used? Perhaps it could be called a graphic arts coating. Log in or register to post...

Last reply: Anastasia Makarenko, Nov 30, 2015, 8:08 am

Resort Hotel and Condo

NC-2009 MPR2: Must be a complete, permanent building or space
posted by John Zehren on Nov 30, 2015, 6:33 pm

I am working on a 7 story resort hotel and condo under LEED 2009 NC. We just received word that the 9 Condos on floors 6 and 7 will be finished at a future date. Floors 1-5 are under...

Last reply: Christopher Schaffner, Dec 17, 2015, 7:01 pm

2 office floors on a 20 stories building

EBOM-v4 MPR2: Must use reasonable LEED boundaries
posted by Michael E. Edmonds-Bauer on Dec 7, 2015, 5:50 pm

Hello,

We have a cliente that is interested in pursuing LEED for his brand new offices. They have been operating for the past 6 months and they do not have any documentation about LEED...

Last reply: Trista Brown, Jan 5, 2016, 2:23 pm

SRI Value from the Test Certificate

NC-2009 SSc7.2: Heat island effect - roof
posted by Nandana Kumar on Dec 10, 2015, 4:52 am

Hello,

Whenever we receive a...

Last reply: Arthika Saseendranath, Jan 12, 2021, 7:05 am

LEED CS building with very minimum landlord provision

CS-2009 EAp2: Minimum Energy Performance
posted by Michael Wahjudi on Dec 10, 2015, 11:27 pm

Hi all, I have LEED CS with very minimum client provision without AC systems (only emergency lights, emergency fans and lifts). But the main tenant has been agreed from the building and the...

Last reply: Michael Wahjudi, Dec 15, 2015, 2:07 am