Topic | Recent |
---|---|
Hi all,NC-2009 EAp2: Minimum Energy Performanceposted by Visu Boj on Apr 14, 2015, 5:57 am
I am working on a certification for a factory having less than 5 percent conditioned area. My process load is also high upto 75 percent. Can any one suggest me how to get savings in optimize... Last reply: Visu Boj, Apr 17, 2015, 1:03 am |
|
ASHRAE standardNC-2009 EAp2: Minimum Energy Performanceposted by Nelina Loiselle on Apr 15, 2015, 10:33 am
Hello, Can someone let me know if ASHRAE 90.1 2010 is acceptable to use in relation to lighting or is 90.1 - 2007 still required to be used? I have read the FAQs above, but want to make... Last reply: Nelina Loiselle, Apr 15, 2015, 2:46 pm |
|
Clean Linen closets and Dirty Utility rooms in a rehab centerNC-2009 IEQc5: Indoor Chemical and Pollutant Source Controlposted by Saju Varghese on Apr 15, 2015, 6:19 pm
Are linen closets and dirty utility rooms required to have exhaust to meet this credit? I know laundry rooms are Last reply: Michelle Halle Stern, May 14, 2015, 12:10 pm |
|
Scope of the creditCredit Forumsposted by Frantisek Macholda on Apr 24, 2015, 5:31 am
Hello, Last reply: Trista Brown, Oct 28, 2015, 3:38 pm |
|
No LEED ND v4 RP credits on LEED website?ND-v4 RPc1: Regional Priorityposted by Nate Tsang on Apr 24, 2015, 12:37 pm
There are no LEED v4 ND RP credits on the regional priority credit lookup on the USGBC website. Can these projects receive RP credits? If so, should they target LEED v3 ND RP or LEED v4 BD+C RP... Last reply: Casey Studhalter, Jan 14, 2016, 2:50 pm |
|
Enter way/Filling out the FormCI-2009 IEQc5: Indoor Chemical and Pollutant Source Controlposted by Bridgett Weaver on Apr 27, 2015, 12:54 pm
Working on a project that the occupancy of the building is a multi-tenant. Would the project still be able to receive this credit, if the entryway / walk off mats are not apart of the project... Last reply: Michelle Halle Stern, Apr 30, 2015, 10:50 am |
|
Commingled Waste DiversionEBOM-2009 MRc9: Solid waste management - facility alterations and additionsposted by Michelle Rosenberger on Apr 27, 2015, 1:16 pm
I see nothing in this credit that discusses commingled diversion methodologies or requires monthly diversion rate backup from facilities like the NC rating system. Does this credit like LEED for... Last reply: Michelle Rosenberger, Apr 27, 2015, 6:32 pm |
|
conductive rubber flooringNC-2009 IEQc4.3: Low-emitting materials - flooring systemsposted by Lyle Axelarris on Apr 30, 2015, 2:43 pm
In the past, we've used FloorScore-certified Static Dissipative rubber Tiling for Comm rooms. The client is now asking for conductive rubber flooring instead of dissipative. The proposed... Last reply: Lyle Axelarris, Apr 14, 2016, 9:31 pm |
|
Drain Water Heat Recovery SystemNC-2009 EAp2: Minimum Energy Performanceposted by Luis Barros on Apr 30, 2015, 4:03 pm
A client wants to utilize our Zypho Drain Water Heat recovery system for a hospitality project. The client wants to confirm the availability of LEED credits. My understanding is that while the... Last reply: Jean Marais, May 4, 2015, 9:41 am |
|
EAc5 Option 3NC-2009 EAc5: Measurement and Verificationposted by Sheryl Swartzle on May 18, 2015, 2:39 pm
Our client chose Option 2 on the PIf1 and the form has been approved. They have decided to pursue the 1 point available in EAc5 for choosing Option 1 in PIf1. Is it acceptable to update PIf1... Last reply: Sheryl Swartzle, May 18, 2015, 3:34 pm |