Topic | Recent |
---|---|
External Lightning ExceptionsNC-2009 EAp2: Minimum Energy Performanceposted by Marina Andrade on Oct 14, 2014, 6:30 am
Hi everyone, It is necessary to prove the power... Last reply: Marina Andrade, Oct 14, 2014, 8:54 am |
|
GoO equivalency to Green-e StandardNC-v4 EAc7: Green power and carbon offsetsposted by Paola Moschini on Oct 15, 2014, 7:07 am
Dear All, Last reply: Marcus Sheffer, Nov 2, 2014, 6:53 pm |
|
More Info on Program is NeededGeneral forumsposted by Melissa Wrolstad on Oct 15, 2014, 11:58 am
There is not very much information released on the program yet, even if you speak directly with representatives of the program and drill them with pointed questions. Last time we checked... Last reply: Kathryn West, Oct 31, 2014, 4:31 pm |
|
What if only 2 of 3 stairwells meet daylighting requirement?Pilot-Credits EQpc78: Design for active occupantsposted by Steve Loppnow on Oct 15, 2014, 3:05 pm
In a multi-family project, we have 2 of 3 stairwells that meet the daylighting requirement. Would we still be able to claim credit for the daylighting option, as 1 of our 7 features? I'm assuming... Last reply: Becky Dix, Apr 27, 2015, 3:19 pm |
|
100% OA multiple zones systemNC-2009 IEQp1: Minimum indoor air quality performanceposted by Charline SEYTIER on Oct 16, 2014, 4:43 am
Hi Everyone, We are currently working on a project including an 100% OA... Last reply: Andrew Mitchell, P.E., Oct 28, 2014, 8:41 am |
|
Hot desks as regularly occupied space?NC-2009 IEQc8.1: Daylight and views - daylightposted by Paul Rogers on Oct 20, 2014, 6:07 am
Should an area designated for hot desking be included as a regularly occupied area? No single user will spend more than one hour per day at these workstations. Last reply: Jill Perry, PE, Oct 20, 2014, 6:35 pm |
|
Ventilation EffectivenessNC-2009 IEQp1: Minimum indoor air quality performanceposted by Dustin Balton on Oct 20, 2014, 11:43 am
I am working for a client who has a variable refrigerant HVAC system with a separate fully condition ventilator supplying fresh air. They are over budget and the contractor is proposing ducting... Last reply: Dustin Balton, Oct 20, 2014, 1:21 pm |
|
Energy saving in the hot water system with low flow fixtureCS-2009 EAp2: Minimum Energy Performanceposted by Panupant Phapant on Oct 21, 2014, 11:01 am
Dear All We would like to know whether EAp2 and EAc1, LEED NC Version 2009, allow to count energy saving in hot water system by using low-flow shower heads as the ASHRAE 90.1 Appendix G... Last reply: Panupant Phapant, Nov 1, 2014, 12:13 am |
|
Selection of HVAC Baseline SystemNC-2009 EAp2: Minimum Energy Performanceposted by Praveenbabu Rajkumar on Oct 23, 2014, 6:26 am
Hi, Sorry for my English Any one can suggest, which is correct baseline HVAC system for following project description. No. of Floors: 7 - including terrace floor (B+G+4+... Last reply: Marcus Sheffer, Nov 2, 2014, 6:29 pm |
|
IDF curvesNC-2009 SSc6.1: Stormwater design - quantity controlposted by MKK LEED on Oct 23, 2014, 12:19 pm
Hi, Last reply: Gustavo De las Heras Izquierdo, Jul 22, 2015, 2:55 pm |