Previously developedCS-v4 LTc4: Surrounding density and diverse usesposted by Petra Hajná on Apr 24, 2014, 3:11 am
So the project site doesn't need to be previously developed any more to achieve the credit or do I miss some important interpretation? Last reply: Tristan Roberts, Aug 26, 2017, 12:36 pm |
|
Reclaimed land from seaNC-v4 MPR1: Must be in a permanent location on existing landposted by Bazeeth Ahamed K M on Apr 24, 2014, 6:12 am
"All LEED projects must be constructed and operated on a permanent location on existing land" So reclaimed land from sea(artificial island) would not be eligible for LEED V 4 as they are not... Last reply: Lyndane Dimas, Aug 8, 2018, 11:18 am |
|
Guide to ASHRAE 62, and especially Natural VentilationNC-2009 IEQp1: Minimum indoor air quality performanceposted by Joseph Snider on Apr 24, 2014, 4:07 pmof using natural ventilation in occupied buildings, especially in hot climates. Also, if you are using LEEDv4, then you the v4 forum would be a good place to go for more information during your certification... Last reply: Andrew Mitchell, P.E., Jun 10, 2014, 1:27 pm |
|
LEED for HealthCare 2009: International ProjectsLEED Rating System Selectionposted by Maya Karkour on Apr 25, 2014, 2:10 pm
Hi All, Last reply: Maya Karkour, May 2, 2014, 4:16 am |
|
Furniture documentationNC-2009 MRc4: Recycled Contentposted by Nouran Abdel-Rahman on Apr 28, 2014, 8:50 am
Can I add the total cost of furniture, and consider it as one item in the LEED form? Last reply: Jon Clifford, May 5, 2014, 12:10 pm |
|
EAC2 Form DefinitionsNC-2009 EAc2: On-Site Renewable Energyposted by Robert Wichert on Apr 28, 2014, 10:07 am
The EAC2 Form asks for "Annual Renewable Energy Cost". I believe this is the SAVINGS from the... Last reply: Marcus Sheffer, May 8, 2014, 11:00 am |
|
Life and Light OutputEBOM-2009 MRc4: Sustainable purchasing - reduced mercury in lampsposted by Simon Sue on May 1, 2014, 1:32 am
This credit requires not only the mercury content of the bulbs, but specific life and light output using specified testing methods: Last reply: Simon Sue, May 9, 2014, 12:01 am |
|
Central Plant- LEED Group Project- 2 BuildingsNC-2009 EAc1: Optimize Energy Performanceposted by Victoria Watson on May 3, 2014, 7:16 pm
Hi, I have a central plant in 1 building that serves an adjacent building. It is part of the same development but because it is only connected by an unheated walkway the project is being... Last reply: Victoria Watson, May 5, 2014, 1:12 pm |
|
Very confused- Natural VentilationNC-2009 IEQc2: Increased Ventilationposted by Jeff Potter on May 5, 2014, 11:42 am
My building currently achieves IEQp1 for Mechanical Ventilation rates. All of my regularly occupied spaces (classrooms, offices, conference rooms, etc) have operable windows with a 4%... Last reply: Jeff Potter, May 6, 2014, 10:09 am |
|
FSC WOODNC-2009 MRc7: Certified Woodposted by jack larson on May 6, 2014, 4:21 am