Log in
Forum
Topic

Previously developed

CS-v4 LTc4: Surrounding density and diverse uses
posted by Petra Hajná on Apr 24, 2014, 3:11 am

So the project site doesn't need to be previously developed any more to achieve the credit or do I miss some important interpretation?

Last reply: Tristan Roberts, Aug 26, 2017, 12:36 pm

Reclaimed land from sea

NC-v4 MPR1: Must be in a permanent location on existing land
posted by Bazeeth Ahamed K M on Apr 24, 2014, 6:12 am

"All LEED projects must be constructed and operated on a permanent location on existing land" So reclaimed land from sea(artificial island) would not be eligible for LEED V 4 as they are not...

Last reply: Lyndane Dimas, Aug 8, 2018, 11:18 am

Guide to ASHRAE 62, and especially Natural Ventilation

NC-2009 IEQp1: Minimum indoor air quality performance
posted by Joseph Snider on Apr 24, 2014, 4:07 pm

of using natural ventilation in occupied buildings, especially in hot climates. Also, if you are using LEEDv4, then you the v4 forum would be a good place to go for more information during your certification...

Last reply: Andrew Mitchell, P.E., Jun 10, 2014, 1:27 pm

LEED for HealthCare 2009: International Projects

LEED Rating System Selection
posted by Maya Karkour on Apr 25, 2014, 2:10 pm

Hi All,
Does someone know if LEED for HealthCare 2009 is available for International Projects?
Thanks a lot,

Last reply: Maya Karkour, May 2, 2014, 4:16 am

Furniture documentation

NC-2009 MRc4: Recycled Content
posted by Nouran Abdel-Rahman on Apr 28, 2014, 8:50 am

Can I add the total cost of furniture, and consider it as one item in the LEED form?

Last reply: Jon Clifford, May 5, 2014, 12:10 pm

EAC2 Form Definitions

NC-2009 EAc2: On-Site Renewable Energy
posted by Robert Wichert on Apr 28, 2014, 10:07 am

The EAC2 Form asks for "Annual Renewable Energy Cost". I believe this is the SAVINGS from the...

Last reply: Marcus Sheffer, May 8, 2014, 11:00 am

Life and Light Output

EBOM-2009 MRc4: Sustainable purchasing - reduced mercury in lamps
posted by Simon Sue on May 1, 2014, 1:32 am

This credit requires not only the mercury content of the bulbs, but specific life and light output using specified testing methods:
· Life of bulb: 3 hours on/20 minutes off for fluorescent...

Last reply: Simon Sue, May 9, 2014, 12:01 am

Central Plant- LEED Group Project- 2 Buildings

NC-2009 EAc1: Optimize Energy Performance
posted by Victoria Watson on May 3, 2014, 7:16 pm

Hi,

I have a central plant in 1 building that serves an adjacent building. It is part of the same development but because it is only connected by an unheated walkway the project is being...

Last reply: Victoria Watson, May 5, 2014, 1:12 pm

Very confused- Natural Ventilation

NC-2009 IEQc2: Increased Ventilation
posted by Jeff Potter on May 5, 2014, 11:42 am

My building currently achieves IEQp1 for Mechanical Ventilation rates.

All of my regularly occupied spaces (classrooms, offices, conference rooms, etc) have operable windows with a 4%...

Last reply: Jeff Potter, May 6, 2014, 10:09 am

FSC WOOD

NC-2009 MRc7: Certified Wood
posted by jack larson on May 6, 2014, 4:21 am

Three questions

1) The LEED reference guide states that both...

Last reply: Jon Clifford, May 7, 2014, 12:38 pm