State DEQ-Listed Brownfield Site - credit denied
NC-2009 SSc3:Brownfield Redevelopmentposted by Michele Otazua on
In our first review, our credit was denied. We are on a zero lot line property with the building occupying the entire site, but the site is listed on the state DEQ register of brownfield sites.
Multiple buildings with common basement
posted by Katherine Mariano on
Hi, I just want to know your opinion regarding the possibility of applying campus credits on multiple buildings with common basement.
LEED Homes Pilot Credit 29 - Gimme Point
Pilot-Credits PC29:Housing and Jobs Proximityposted by Aaron Gary on
Has anyone else looked at this credit for their projects? It seems like a gimme with the Option 2 threshold and I want to make sure I am not missing something
Single-Use Batteries
EBOM-2009 MRc7:Solid Waste Management—Ongoing Consumablesposted by Sara Zoumbaris on
Has anyone been successful at or read any LEED Interpretations/ Updates that allow single-use batteries to be exempt from the battery portion of this credit?
BDC Material & Resource Calculator- Percentage Regional
CS-2009 MRc5:Regional Materialsposted by Suha Hyderabad on
I have a question regarding the BDC Material Tracker, % Regional.
LEED Letter template
CS-2009 MRc5:Regional Materialsposted by Steve Salzman on
I am looking for the LEED letter template for CS 2.0 MRc5 (the credit requirements specify that this is necessary in order to capture the credit for the tenant lease/sales option).
Do I include plumbing fixtures in the materials scope
NC-2009 MRc4:Recycled Contentposted by Erika Duran on
Hi I know accessories are included but are actual plumbing fixtures included in these calcs? They are not with Divs 3-10
Data Center in on Office building Energy Modelling Calculations
NC-2009 EAc1:Optimize Energy Performanceposted by ESRA OZKONUKSEVER on
Hi all, We re currently working on an office building project of 10.000 square meters and within the building there is a data center as big as 150 square meters. we are plannig to apply v2009 NC.
documenting Option 3, share energy/water usage
CS-2009 EAc5.1:Measurement and Verification—Base Buildingposted by Courtney Royal on
if our CS project goes with option 3, what space usage data will the mgmt company, who will only control the common areas (after building is complete) be required to share?
Envelope materials with no provided u-values
NC-2009 EAp2:Minimum Energy Performanceposted by John Covello on
Hello, On our project we are getting supplied from local contractors materials like sandstone, granite, reused teak wood, and limestone.