VOC limits for the welding of PP-R

NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  Panupant Phapant  on 

Dear All Our project uses PP-R pipe (Polypropylene Random Copolymer) for chilled water piping. The PP-R pipes is connected together by welding.

3
Default Avatar
SCG Cement - Building Materials
LEEDuser Basic Member
13 thumbs up
Thu Mar 26, 2015, 11:19 am

A site with large building footprint

NC-2009 SSc5.1:Site Development—Protect or Restore Habitat
posted by  Magda Aghababyan  on 

Hello, Mine is a greenfield site that has a building footprint that takes almost the entire land.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Thu Mar 26, 2015, 3:52 am

Point Structure For MRc5

NC-2009 MRc5:Regional Materials
posted by  Robert Sherlock  on 

Has the point structure for this credit changed from 10% - 20% to 20% - 30%

3
Default Avatar
Western Industrial Contractors Ltd
LEEDuser Basic Member
0 thumbs up
Thu Mar 26, 2015, 2:49 am

HVAC System 8 Baseline

CS-2009 EAp2:Minimum Energy Performance
posted by  CINDY CHAI  on 

Hi all, Currently I have a project in Malaysia that is going for LEED Core and Shell (2009), the project consists of multiple buildings but will be certified under one certificate.

3
Default Avatar
ESD SENIOR ENGINEER
KAER SDN BHD
LEEDuser Basic Member
0 thumbs up
Thu Mar 26, 2015, 12:39 am

LEED 2009 for Retail: Commercial Interiors EAc1.5

Retail-CI-v2009 EAc1.5:Optimize energy performance - building envelope
posted by  Robert Brown  on 

We have an existing building being renovated. The existing building envelope does not meet ASHRAE 90.1-2007 criteria.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Wed Mar 25, 2015, 3:02 pm

IEQP1 Online template

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Stella Stella  on 

Hi All, Our project has some of the areas that are mechanically ventilated (AHU/FCU) and some spaces that are naturally ventilated. We have provided the details for both.

4
Wed Mar 25, 2015, 2:19 am

Systems manual

CS-2009 EAc3:Enhanced Commissioning
posted by  Michael E. Edmonds-Bauer  on 

We are done with our commissioning process and almost ready to submit for preliminary construction review, however the systems manual (Upload EAc3-1) is develop in Spanish language since it is the

4
Tue Mar 24, 2015, 10:58 pm

Monitoring System

CS-2009 EAc5.2:Measurement and Verification—Tenant Submetering
posted by  Marina Andrade  on 

Hi! In the project we have not a BMS system to monitor energy consumption but the electric company will be regularly measured.

8
Sr. Sustainability Consultant
Taitem Engineering
LEEDuser Basic Member
36 thumbs up
Tue Mar 24, 2015, 5:59 pm

Garage below grade

NC-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  FABIO VIERO  on 

Hi All, I'm now working on a project under LEED certification which aims to pursue this credit. This project has an external parking area (which is included in the LEED Boundary) above grade and ex

2
Tue Mar 24, 2015, 5:58 pm

Modeling Radiant Panels with DOAS

NC-2009 EAp2:Minimum Energy Performance
posted by  FABIO VIERO  on 

Since eQUEST is unable to model dedicated outdoor air system linked to the radial panels, we modeled DOAS units by creating “dummy zones” within the model.

3
Head of Sustainability
Manens S.p.A.
LEEDuser Premium Member
16 thumbs up
Tue Mar 24, 2015, 5:35 pm