VOC limits for the welding of PP-R
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Panupant Phapant on
Dear All Our project uses PP-R pipe (Polypropylene Random Copolymer) for chilled water piping. The PP-R pipes is connected together by welding.
A site with large building footprint
NC-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Magda Aghababyan on
Hello, Mine is a greenfield site that has a building footprint that takes almost the entire land.
Point Structure For MRc5
NC-2009 MRc5:Regional Materialsposted by Robert Sherlock on
Has the point structure for this credit changed from 10% - 20% to 20% - 30%
HVAC System 8 Baseline
CS-2009 EAp2:Minimum Energy Performanceposted by CINDY CHAI on
Hi all, Currently I have a project in Malaysia that is going for LEED Core and Shell (2009), the project consists of multiple buildings but will be certified under one certificate.
LEED 2009 for Retail: Commercial Interiors EAc1.5
Retail-CI-v2009 EAc1.5:Optimize energy performance - building envelopeposted by Robert Brown on
We have an existing building being renovated. The existing building envelope does not meet ASHRAE 90.1-2007 criteria.
IEQP1 Online template
NC-2009 IEQp1:Minimum IAQ Performanceposted by Stella Stella on
Hi All, Our project has some of the areas that are mechanically ventilated (AHU/FCU) and some spaces that are naturally ventilated. We have provided the details for both.
Systems manual
CS-2009 EAc3:Enhanced Commissioningposted by Michael E. Edmonds-Bauer on
We are done with our commissioning process and almost ready to submit for preliminary construction review, however the systems manual (Upload EAc3-1) is develop in Spanish language since it is the
Monitoring System
CS-2009 EAc5.2:Measurement and Verification—Tenant Submeteringposted by Marina Andrade on
Hi! In the project we have not a BMS system to monitor energy consumption but the electric company will be regularly measured.
Garage below grade
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by FABIO VIERO on
Hi All, I'm now working on a project under LEED certification which aims to pursue this credit. This project has an external parking area (which is included in the LEED Boundary) above grade and ex
Modeling Radiant Panels with DOAS
NC-2009 EAp2:Minimum Energy Performanceposted by FABIO VIERO on
Since eQUEST is unable to model dedicated outdoor air system linked to the radial panels, we modeled DOAS units by creating “dummy zones” within the model.