Forum quick links
Green Products for Integrated Pest Management Plan
EBOM-2009 SSc3:Integrated Pest Management, Erosion Control, and Landscape Managementposted by Yong Lee Low on
Hi All, Can I check if the local green certification for products can be used in place of Green Seal products for the integrated pest management plan, as well as other policies, e.g.
Must non-potable water sources be used to earn IP credit?
NC-v4 IPc1:Integrative processposted by Eesmyal Santos-Brault on
It appears that this credit can not be earned if a project does not meet some water demand through nonpotable sources.
non-aerosol spray adhesives?
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Erin Holdenried on
For a non-aerosol spray adhesive, must it comply with SCAQMD 1168 or GS-36?
Extent of Documentation
NC-2009 IEQc8.2:Daylight and Views—Viewsposted by David Browne on
I know from having attempted this credit on other projects that the documentation can be tedious, but I have a current project where it seems ridiculous.
Rating System Selection CI
posted by Christian Bösselmann on
Dear all I am hesitating whether the following project could obtain a CI certificate for the entire building: -existing office building -one entity owns the entire building -interior works will be
Square Footage for the Decorative Lighting Allowance
CI-2009 EAc1.1:Optimize Energy Performance—Lighting Powerposted by Christopher Shaw on
When you claim a lighting allowance for Decorative appearance you get 1 watt/sf.
Professional Engineer
EBOM-v4 EAp2:Minimum energy performanceposted by Charalampos Giannikopoulos on
To comply with the prerequisite is it essential to engage a Professional Engineer if the project is located outside the U.S. and consequently ineligible for Energy Star certification?
Cooling only space and system type 2
NC-2009 EAp2:Minimum Energy Performanceposted by Laura Brandt on
I have a dormitory project which has a few cooling only spaces.
EAp2/EAc1, 1 pt denied, therefore, incorrect kWh - what to do?
NC-2009 EAc6:Green powerposted by Peg Manuel on
Using Option 1.
Double the Pleasure???
Pilot-Credits WEpc10:Sustainable wastewater managementposted by Molly Jones on
So...if we participate in this pilot credit (option 1) AND we already comply with LEED-NC 2009 WEc2, is it safe to assume that we will be awarded 2 points under the LEED-NC 2009 WEc2 AND 1 ID point