DES for a combination of rated and non-rated building

NC-2009 EAp2:Minimum Energy Performance
posted by  Bradley Felts  on 

I have a project that will be conditioned by a water-cooled chiller and boiler plant located in one of the building that will be rated.

5
Default Avatar
Atlantec Engineers
LEEDuser Basic Member
0 thumbs up
Wed Aug 26, 2015, 7:44 pm

LEED CS 2009 EAc1

CS-2009 EAc1:Optimize Energy Performance
posted by  Ruel Galve  on 

We are currently doing a LEED 2009 CS - GOLD project in Jakarta. The question is: Do we need to select our equipment (pumps and fans) based on the recommended baseline building design power from A

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Wed Aug 26, 2015, 2:04 am

Baseline ventilation rates

NC-2009 EAp2:Minimum Energy Performance
posted by  TOMAS URIBE  on 

When the project is pursuing the increase ventilation which ventilation rates have to be used for the baseline 62.1 or 62.1 + 30%? I am working in LEED V2009. ASHRAE 90.1-2007

3
Default Avatar
PROJECT MANAGER
SOLUCIONES ENERGETICAS SOSTENIBLES
LEEDuser Basic Member
7 thumbs up
Tue Aug 25, 2015, 5:26 pm

n/a

NC-2009 EAp2:Minimum Energy Performance
posted by  Curtis Clark  on 

For Non-Residential fenestration system that are designed to be field glazed or field assembled units for compliance with ASHRAE 90.1-2010, the supplier provides a certificate according to NFRC pro

4
Tue Aug 25, 2015, 1:59 pm

Measuring Flow Rate

CI-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Robert Calloway  on 

Hello, We are investigating a building that claims to have reduced flow fixtures installed but this does not seem to be the case.

2
Mechanical Engineer
Integral Group
LEEDuser Expert
342 thumbs up
Tue Aug 25, 2015, 10:29 am

Water use test report

CI-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Jatuwat Varodompun  on 

In case the the manufacturer does not have the cutsheet showing the water data, can we do the on-site measurement and adjust the flowrate to be used in the calculation? We plan to do the elaborate

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Tue Aug 25, 2015, 10:23 am

Innovation and Design - Green Building Education

NC-2009 IDc1:Innovation in Design
posted by  Rick Alfandre  on 

We are in between preliminary and final design review, and are thinking of pursuing an I&D credit for Green Building Education.

4
Mon Aug 24, 2015, 1:33 pm

Are we allowed to used our own developed excel sheets?

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Mehdi Kardehi  on 

Hi All, A quick question. Are we allowed to submit our own calculation spreadsheets of ASHRAE 62.1 or we have to use LEED provided forms to apply for this credit? Cheers, Medi

2
Sat Aug 22, 2015, 8:22 am

Densely occupied spaces

NC-2009 EAp2:Minimum Energy Performance
posted by  Vassil Vassilev  on 

Hi Markus, I'd like to ask you for your opinion and advice about applying these values following the case described below. In LEED glossary such spaces are determined as 25 people per 100 sq ft. W

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Fri Aug 21, 2015, 4:55 pm

VRF with DOAS inyecting air into common return plenum

EBOM-2009 IEQp1:Minimum IAQ Performance
posted by  Zonda E. Team  on 

Hi there, I'm working on a project with VRF + DOAS, where outside air is injected into a common return plenum for all VRF indoor units.

2
Senior Sustainability Manager
WSP - Built Ecology
LEEDuser Expert
188 thumbs up
Fri Aug 21, 2015, 3:25 pm