In case the the manufacturer does not have the cutsheet showing the water data, can we do the on-site measurement and adjust the flowrate to be used in the calculation?

We plan to do the elaborated test report by measuring all fixtures used with contractor and CxA. Is it necessary to get the letter from the manufacturer to confirm the onsite test report?