Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Bus Stops Planned, Not Yet Built

ND-v2009 SLLc3:Locations with reduced automobile dependence
posted by  Sara Zoumbaris  on 

I am hoping someone can confirm for me whether planned bus stops which are not yet official/ in place but are guaranteed, may be included for credit achievement?

2
LEED AP-ND, Principal
Criterion Planners
LEEDuser Expert
231 thumbs up
Mon Nov 2, 2015, 6:14 pm

Site lighting outside the LEED project boundary?

NC-2009 EAp2:Minimum Energy Performance
posted by  Anya Fiechtl  on 

Our project is within a larger property owned by the same entity, and some illuminated paths and roads extend beyond our LEED project boundary, so we're referencing CIR #10236, which allows expand

3
Architect
Buro Happold
LEEDuser Basic Member
55 thumbs up
Mon Nov 2, 2015, 5:49 pm

Alternative Compliance in lieu of LEED Tables

NC-2009 IEQp1:Minimum IAQ Performance
posted by  kevin connolly  on 

Has anyone been successful using the alternative compliance path and submitting their own ASHRAE 62.1 calculation/spreadsheets in lieu of using the built in LEED or 62MZCalc form? We would rather

2
Practice Leader - Sustainability
EUA
LEEDuser Expert
510 thumbs up
Mon Nov 2, 2015, 1:21 pm

How to deal with a hotel.

NC-2009 SSc4.4:Alternative Transportation—Parking Capacity
posted by  Susan Di Giulio  on 

Others have asked this before and not gotten an answer so I'm taking another shot. Can someone please verify this approach?

2
Fri Oct 30, 2015, 7:06 pm

Gym Floor Paints

Schools-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatings
posted by  Shelley White  on 

Does anyone know if the graphic arts coating VOC limit of 500 g/L used for Game Line paints is acceptable or do game line paints have to comply with the 150 g/L limit effective 1/1/14?

4
Fri Oct 30, 2015, 12:07 am

Checklist states 2 points possible

NC-v4 EQc1:Enhanced indoor air quality strategies
posted by  Parker williams  on 

Are you allowed to do both options for this credit? 2 points possible or 1?

4
Thu Oct 29, 2015, 9:14 pm

Crade to Gate or Cradle to Grave

NC-v4 MRc2:Building product disclosure and optimization - environmental product declarations
posted by  Christine Richey  on 

The company I work for is just in the beginning stages of creating a type III EPD for our engineered wood products.

3
Editorial Director
BuildingGreen, Inc.
LEEDuser Expert
159 thumbs up
Thu Oct 29, 2015, 9:08 pm

FSC Mix cabinet with Recycled content

NC-2009 MRc7:Certified Wood
posted by  Indochine Engineering VN  on 

Hi, one kitchen supplier showed me their CoC certificate that says the status of material is FSC Mix and they also confirmed their cabinet products have 25% recycled content.

4
Thu Oct 29, 2015, 8:27 pm

Light meter phone apps

NC-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Ben Thompson  on 

Hi all, I'm going to do the measurement method for the first time, and was looking into using a light meter app on my phone to do it- would this be acceptable?

4
Thu Oct 29, 2015, 4:27 pm

Scope of the credit

Credit Forums
posted by  Frantisek Macholda  on 

Hello, I am not sure if this credit covers the equipment purchased for building management purposes only (i.e.

4
Wed Oct 28, 2015, 7:38 pm